Dometic 3341P Скачать руководство пользователя страница 7

7

c.  Carefully install the duct divider in the roof 

opening 143 mm from back of roof opening. 

See (FIG. 9).

Foil back faces rear of unit.

FIG. 9

Rear

Base Pan

143 mm From Back 

Of Roof Opening

Duct Divider

Front

Black Side

To Front

6.  Ceiling Template Installation

a.  Plug the 9 pin electrical cord from the top unit 

into the matching 9 pin connector in the elec-

tronic control box. The plug is polarized and 

will only fit in one direction. See (FIG. 10).

FIG. 10

Strain Relief

Proper Orientation 

Of Strain Relief

220-240 Vac 

Power Supply

3 Pin 

Heater 

Connection

b.  Plug the 3 pin heater cord (if applicable) from 

the top unit into the matching 3 pin connector 

in the electronic control box. See (FIG. 10).

c.  Install supplied strain relief in junction box 

hole cutout. It may already be installed on 

some units.

d.  Route the previously run 220-240 Vac pow-

er supply wire through strain relief and into 

junction box. See (FIG. 10). If making a plug-

in connection see d on page 9.  

e.  Secure 220-240 Vac power supply wire by 

tightening strain relief screw making sure not 

to damage wires. See (FIG. 10).

FIG. 6

Duct Divider

Ceiling 

Template

ADB

Control 

Box

3.  All models in this manual will use a four (4) bolt 

pattern for installing the ADB kit.

4.  Reach up into the return air opening of the unit 

and pull the unit electrical cord down for later 

connection. See (FIG. 7).

FIG. 7

Electrical 

Cord

Measure Ceiling 

Thickness

5.  Duct Divider Installation

a.  Measure the ceiling thickness. See (FIG. 7).
b.  Cut away the number of rows as indicated in 

table below. See (FIG. 8).

Ceiling

Thickness

# Of 

Rows

To Cut

Ceiling

Thickness

# Of 

Rows

To Cut

Min.

Max.

Min.

Max.

152 mm

165 mm

0

89 mm

102 mm

5

140 mm

152 mm

1

76 mm

89 mm

6

127 mm

140 mm

2

64 mm

76 mm

7

114 mm  127 mm

3

51 mm

64 mm

8

102 mm

114 mm

4

38 mm

51 mm

9

 

FIG. 8

Remove  Rows  

Starting Here

INSTALLATION INSTRUCTIONS

Unit Electrical 

Cord

Содержание 3341P

Страница 1: ...metic Corporation LaGrange IN 46761 Roof Top Unit Description Model Type Use With Air Distribution Box not included Model Control Air Conditioner B3300 3341P 83341A 3314865 000 Integral Mechanical Dur...

Страница 2: ...enter Air Discharge 11 MAINTENANCE 12 A Air Filter 12 B ADB Housing 12 C Fan Motor 12 GENERAL INFORMATION 12 A Frost Formation On Cooling Coil 12 B Heat Gain 12 C Condensation 12 SERVICE UNIT DOES NOT...

Страница 3: ...tremely hazardous Do NOT add any devices or accessories to this product except those specifically authorized in writing by Dometic Corporation This manual has safety information and instructions to he...

Страница 4: ...oling Capacity kW 3 4 Electric Heat Capacity kW 1 6 Electrical Rating 220 240 Vac 50 Hz 1 ph Full Load Amps Compressor Motor 5 56 1 4 Locked Rotor Amps Comp Motor 25 2 6 Power kW Compressor Motor 1 38...

Страница 5: ...er referred to as ADB obstructions i e space for doors to open room dividers curtains ceiling fixtures etc See FIG 2 FIG 2 587 mm 537 mm 67 mm Dimensions Are Nominal 294 5 mm 294 5 mm 537 mm 87 5 mm 8...

Страница 6: ...Vac sup ply wire from the time delay fuse or circuit break er box to the roof opening Use a listed certified non metallic sheathed single strand cable See A Table Unit Data on page 4 a This supply wir...

Страница 7: ...un 220 240 Vac pow er supply wire through strain relief and into junction box See FIG 10 If making a plug in connection see d on page 9 e Secure 220 240 Vac power supply wire by tightening strain reli...

Страница 8: ...an In some areas electricians MUST be li censed You may either wire direct into the junction box for a permanent connec tion or wire a molded plug into the junction box for a plug connection c If a pe...

Страница 9: ...t the end of the roof opening farthermost from the junction box Route the plug wire into the junction box in a manner that will not block air flow Connect to terminal block as described in c above e C...

Страница 10: ...supplied sheet metal screws in side return air opening to secure ADB to ceiling template See FIG 17 3 Install eight 8 supplied wood screws inside the front rear and side doors to secure ADB to ceiling...

Страница 11: ...Black Graphic Fan Red Graphic Heating Blue Graphic Cooling 2 The thermostat controls the compressor ON OFF operation within a temperature range of approximately 65 F and 90 F measured at the ADB inle...

Страница 12: ...ume nor mal operation If frost condition persist contact your local service center for assistance B Heat Gain The ability of this air conditioner to maintain the desired inside temperature depends on...

Страница 13: ...is not burnt or circuit breaker is ON and not activated After the above checks call your local service center for further help This unit must be ser viced by qualified service personnel only If any w...

Страница 14: ...ough changes in design or material without being obligated to incorporate such changes in products of prior manufacture Dometic can make changes at any time in design materials or part of units of any...

Страница 15: ...s first put in service the item may still be covered by the Dometic warranty as described in Section A For proof of date put in service Dometic will require a copy of the bill of sale of the Dometic e...

Страница 16: ...ur chase or date of installation 2 Proof of purchase or installation may be required to verify warranty coverage 3 Any unit or replacement part installed due to a warranty failure carries the remainde...

Отзывы: