background image

1

Cool Lube 2 for Sleevoil Pillow Blocks

Part Numbers 063487, 063488, 078289, 078290

Instruction Manual

These instructions must be read thoroughly before installation or operation. This instruction manual was accurate at the time of 

printing. Please see 

dodgeindustrial.com

 for updated instruction manuals.

WARNING: To ensure the drive is not unexpectedly started, turn off and 

lock-out or tag power source before proceeding. Failure to observe these 

precautions could result in bodily injury.

WARNING: Because of the possible danger to person(s) or property 

from accidents which may result from the improper use of products, 

it is important that correct procedures be followed. Products must be 

used in accordance with the engineering information specified in the 

catalog. Proper installation, maintenance and operation procedures 

must be observed. The instructions in the instruction manuals must 

be followed. Inspections should be made as necessary to assure 

safe operation under prevailing conditions. Proper guards and other 

suitable safety devices or procedures as may be desirable or as may 

be specified in safety codes should be provided, and are neither 

provided by Dodge

®

 nor are the responsibility of Dodge. This unit and 

its associated equipment must be installed, adjusted and maintained 

by qualified personnel who are familiar with the construction and 

operation of all equipment in the system and the potential hazards 

involved. When risk to persons or property may be involved, a holding 

device must be an integral part of the driven equipment beyond the 

speed reducer output shaft.

WARNING: All products over 25 kg (55 lbs) are noted on the shipping 

package. Proper lifting practices are required for these products.

WARNING: Only qualified personnel familiar with hydraulic and electrical 

installations, the construction and operation of this equipment, and the 

hazards involved should install, adjust, operate, and/or service it. Read 

and understand this manual in its entirety before proceeding. Failure to 

observe this precaution could result in severe bodily injury or loss of life.

RECEIVING & INSPECTION

1.  Carefully unpack the Cool Lube 2 system. Inspect the system 

for any damage during shipping.

2.  Report any damage to the carrier for claims.

3.  Make sure that available voltage supply is within 10% of the 

system voltage.

4.  Check all hydraulics to ensure that nothing came loose during 

shipping. Tighten as needed.

5.  Changes to this unit may void the warranty.

INSTALLATION

1.  Place the unit in the designated area and anchor it down 

using the 4 mounting holes in the base plate. The unit should 

be positioned below the circulating oil drain holes in the 

bearings so that at least a 15° drain line slope is achieved to 

allow for adequate oil return (see Figure 1).

2.  Make sure that there is enough space around the unit to allow 

for servicing.

3.  Connect oil supply lines (not included) from the two 1/2” NPT 

(female) outputs of the flow meters to the circulating oil inlets 

on the housings. Connection details for each type of Sleevoil 

bearing are provided in sections following (see Figure 2).

NOTE: All plumbing should be cleaned and flushed 

before being connected to the bearings.

SYSTEM SPECIFICATIONS

System Part 

Number

Motors Information

Approximate 

Weights (lbs)

063488

Single Phase—115/230 VAC

257

063487

Three Phase—230/460 VAC

257

078289

Three Phase—208-230/460 VAC 

(Explosion Proof Motors)

257

078290

Three Phase—575 VAC (Canada)

257

NOTE: For Cool Lube 2 Material Details, please refer to cut sheets.

Air to oil heat exchanger: Thermal Transfer BOL-8-2

* Pump Relief valve setting: 150 psi

* Bearing Relief valve setting: 65 psi

Pump flow rate: 

2 GPM

Flow meter range: 0.5 – 4.0 GPM

Oil supply line connection: Two 1/2" NPT connections at the 

flow meter outlets (female)

Oil return line connection:  Two 1” NPT connections (female)

* Relief valves are preset at the factory, but are field adjustable. If other 

settings are required, consult Dodge Engineering

Figure 1 - Cool Lube 2

FLOW
METERS

NEEDLE
VALVES

PUMP 
PRESSURE 
GAUGE

BEARING
PRESSURE 
GAUGE

Figure 2 - Controls

Содержание Cool Lube 2

Страница 1: ...dunderstandthismanualinitsentiretybeforeproceeding Failureto observethisprecautioncouldresultinseverebodilyinjuryorlossoflife RECEIVING INSPECTION 1 Carefully unpack the Cool Lube 2 system Inspect the...

Страница 2: ...ction Manual R Series Circulating Oil Inlet Kit Part No R Series 3 15 16 Circulating Oil Inlet Kit 432153 R Series 4 7 16 through 4 15 16 Circulating Oil Inlet Kit 430198 R Series 5 7 16 through 12 Ci...

Страница 3: ...10 2 1 11 1 2 2 1 2 8 3 4 14 12 2 1 11 1 2 2 1 2 8 3 4 14 RXT Series A Circulating Oil Inlet Kit is NOT required for these pillow blocks The circulating oil inlets are machined into the housing and a...

Страница 4: ...rt 434725 260W X 240V 1 PH Part 434726 Optional Temperature Oil Level Switch Part 434941 Connects to a control system not provided by Dodge in order to monitor oil level and temperature Replacement Fi...

Страница 5: ...AT EXCHANGER MOTOR 21 2 PRESSURE GAUGE 22 2 FLOW METER 1 2NPT 0 5 4 0 GPM 23 1 TOP PLATE 24 1 FILLER BREATHER 25 1 BALDOR PUMP MOTOR 26 1 CHECK VALVE 1 2 HP 7 PSI 3 8 HOSE 1 2 PIPE 1 2 NPT 1 2 NPT 5 G...

Страница 6: ...ery 4000 hours of operation More frequent cleaning is required if the system is used in a highly contaminated atmosphere such as a foundry or paper mill After the initial replacement the supply line f...

Страница 7: ...7 MN3082...

Страница 8: ...Dodge Industrial Inc 1061 Holland Road Simpsonville SC 29681 1 864 297 4800 All Rights Reserved Printed in USA MN3082 02 22 3082 0222 DODGE INDUSTRIAL INC AN RBC BEARINGS COMPANY...

Отзывы: