
Close Test Tabulation
A-112
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
Main Contact
Main Contact parameters and specifications are shown in Figure A.132
and Figure A.133. Graphical results are shown in and Figure A.134 on
page A-114 and Figure A.135 on page A-115.
Figure A.132 Delta (Difference) in Main Contacts Travel Time
- ******* | TRAVEL 6 0.054 |
Rebound
Expected ******* inches | TRAVEL 4 0.004 inches |
Tol ******* | TRAVEL 5 0.004 |
- ******* | TRAVEL 6 0.010 |
Contact Wipe
Expected ******* inches | TRAVEL 4 1.603 inches |
Tol ******* | TRAVEL 5 1.684 |
- ******* | TRAVEL 6 1.591 |
EHV CONTACT TIMING
CLOSE OPERATION
| Specs:
Main Contact Closing Time Measured From 3400 Cont. CH 1 | Maximum 60.0
| Minimum 50.0
Phase A | Phase B | Phase C
Contact | Time |Compare|Contact | Time |Compare|Contact | Time |Compare
| (mS) | | | (mS) | | | (mS) |
A-EHV 1| 54.4 | Pass | B-EHV 1| 52.9 | Pass | C-EHV 1| 54.0 | Pass
A-EHV 2| 54.6 | Pass | B-EHV 2| 53.1 | Pass | C-EHV 2| 54.0 | Pass
| Specs:
Delta Main Contact Closing Time Within a Module| Maximum 0.5
|
Phase A | Phase B | Phase C
Contact | Time |Compare|Contact | Time |Compare|Contact | Time |Compare
| (mS) | | | (mS) | | | (mS) |
A-EHV 1| | | B-EHV 1| | | C-EHV 1| |
A-EHV 2| 0.2 | Pass | B-EHV 2| 0.2 | Pass | C-EHV 2| 0.0 | Pass
| Specs:
Delta Main Contact Closing Time Within a Phase| Maximum 2.0
|
Phase A | Phase B | Phase C
Contact | Time |Compare|Contact | Time |Compare|Contact | Time |Compare
| (mS) | | | (mS) | | | (mS) |
Phase A | 0.2 | Pass |Phase B | 0.2 | Pass |Phase C | 0.0 | Pass
B
- ******* | TRAVEL 6 0.054 |
Rebound
Expected ******* inches | TRAVEL 4 0.004 inches |
Tol ******* | TRAVEL 5 0.004 |
- ******* | TRAVEL 6 0.010 |
Contact Wipe
Expected ******* inches | TRAVEL 4 1.603 inches |
Tol ******* | TRAVEL 5 1.684 |
- ******* | TRAVEL 6 1.591 |
EHV CONTACT TIMING
CLOSE OPERATION
| Specs:
Main Contact Closing Time Measured From 3400 Cont. CH 1 | Maximum 60.0
| Minimum 50.0
Phase A | Phase B | Phase C
Contact | Time |Compare|Contact | Time |Compare|Contact | Time |Compare
| (mS) | | | (mS) | | | (mS) |
A-EHV 1| 54.4 | Pass | B-EHV 1| 52.9 | Pass | C-EHV 1| 54.0 | Pass
A-EHV 2| 54.6 | Pass | B-EHV 2| 53.1 | Pass | C-EHV 2| 54.0 | Pass
| Specs:
Delta Main Contact Closing Time Within a Module| Maximum 0.5
|
Phase A | Phase B | Phase C
Contact | Time |Compare|Contact | Time |Compare|Contact | Time |Compare
| (mS) | | | (mS) | | | (mS) |
A-EHV 1| | | B-EHV 1| | | C-EHV 1| |
A-EHV 2| 0.2 | Pass | B-EHV 2| 0.2 | Pass | C-EHV 2| 0.0 | Pass
| Specs:
Delta Main Contact Closing Time Within a Phase| Maximum 2.0
|
Phase A | Phase B | Phase C
Contact | Time |Compare|Contact | Time |Compare|Contact | Time |Compare
| (mS) | | | (mS) | | | (mS) |
Phase A | 0.2 | Pass |Phase B | 0.2 | Pass |Phase C | 0.0 | Pass
B
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...