Configuring Test Plans
4-74
72A-1898 Rev. A 11/01
Monday
, November 26, 2001 1:09 pm
Figure 4.47 Continuity Test Execution
When the test is successfully completed, the
Continuity Test Results
window appears (Figure 4.48). The active channels are listed, along
with a Pass/Fail designation.
Figure 4.48 Continuity Test Results
If the Continuity Test fails, check all test connections starting with the
circuit breaker connections and then the TDR9000 Physical Front Panel
connections.
Содержание TDR9000
Страница 26: ...xxii 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 50: ...Step 5 Saving Test Results 1 24 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 98: ...3 28 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 200: ...Disconnecting After the Test 4 102 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 362: ...B 34 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 388: ...D 6 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 392: ...E 4 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 394: ...F 2 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 442: ...I 32 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...
Страница 454: ...I 12 72A 1898 Rev A 11 01 Monday November 26 2001 1 09 pm...