DMEGC Solar PV Modules Installation Manual
Installation method
Long side in-rail installation
Short side in-rail installation
In-rail installation
Loading capacity
Test load: positive 5400Pa, negative 2400Pa
Design load: positive 3600Pa, negative 1600Pa
Test load: positive 1600Pa, negative 1600Pa
Design load: positive 1067Pa, negative 1067Pa
M2
、
P1
、
G1
、
M6---60/60H & M2
、
P1
、
G1
、
M6-B/G-60/60H
Installation method
4 bolts at the long frame (inner holes)
8 bolts at the long frame
Bolt
installation
Loading capacity
Test load: positive 5400Pa, negative 2400Pa
Design load: positive 3600Pa, negative 1600Pa
Test load: positive 5400Pa, negative 3600Pa
Design load: positive 3600Pa, negative 2400Pa
Installation method
4 clamps at the long frame
6 clamps at the long frame
Clamp installation
Clamp position
(1/4L-50)<S<(1/4L+50)
(1/2L-80)<S<(1/2L-30); (1/6L-50)<H<(1/6L+50)
Loading capacity
Test load: positive 5400Pa, negative 2400Pa
Design load: positive 3600Pa, negative 1600Pa
Test load: positive 5400Pa, negative 3600Pa
Design load: positive 3600Pa, negative 2400Pa