2.0 BAND TENSION VERIFICATION
2.1 Checking Band Tension on the tool
m
_.,.DANJELS
...
..,
MANUFACTURING
CORPORATION
DATASHEET
2.1.1 Place the verification inspection fixture DBS-CG2 (M81306 /2-01 E)
and the manual banding tool so that they may be oriented as
shown in Figure 8.
2.1.2 Insert a flat band through the band insertion slot of verification
inspection fixture until it extends completely through the fixture
and the band buckle is resting against the backstop.
2.1. 3 Insert the band into the nose of the banding tool as described
in paragraph 1.1.
2.1.4 Repeatedly actuate the movable handle. As you approach the
fixture use short strokes until the band is snug. Then use one
full stroke and the movable handle will lock.
2.1.5 Insert the go member of the Go/No-Go (G691) gage into the gage
verification slot of the verification inspection fixture. If the Go
member does not insert freely, the tool is exerting excessive
force. Likewise, if the No-Go member freely enters the gage
verification slot, the tool is below the minimum force limit.
If tension adjustment is required, see section 2.2 .
2.1.6 To separate, actuate the cutter lever.
2.1. 7 Remove spent band pieces from both the verification inspection
fixture and the banding tool.
BACKSTOP
GAGE
VERIFICATION
SLOT
DBS-1100
MANUAL
BANDING TOOL
GO
GO/NO-GO GAGE
FIGURE 8
PAGE 4
CUTTER
LEVER