Revision: 0
FlexxPump 500 DLS
Continuation sheet
08
EN-
SCHMIERSYSTEME
D I R E C T L U B R I C A T I O N S Y S T E M S
D L S
6.3 Commissioning
Mount the FlexxPump 500 DLS carefully according to the steps described in chapter
6.2.
Depending on the scope of delivery, you must also carry out the following additional
measures for the first-time commissioning:
1. Mechanical fastening
Fix the FlexxPump 500 DLS mechanically. Pay particular attention to the maximum
tightening torques permissible for the M5 female threads!
2. Electrical connection
Connect the FlexxPump 500 DLS to the external power supply or external controller
(PLC) via the M12x1 interface using a suitable cable. Die FlexxPump 500 DLS is now
switched on.
3. Check the assembly
Make sure that the FlexxPump 500 DLS is properly and completely assembled. In par-
ticular the voltage supply has to be ensured.
4. Execute 12 Second signal
Execute the 12 sec signal. For a detailed description please take a look at chapter
8.2.4. The FlexxPump 500 DLS executes a certain number of strokes and delivers the
lubricant from the cartridge to the outlet
5. Hydraulic connection
Connect the consumer hydraulically to the FlexxPump 500 DLS. If you connect tubes to
the FlexxPump 500 DLS, make sure that the tubes and connectors are installed tightly,
cleanly and correctly.
Ideally, use tubes pre-filled with the appropriate lubricant!
6. Check the settings on FlexxPump FlexxPump 500 DLS
Check the factory settings of FlexxPump 500 DLS with the required values for the lubri-
cation point and adjust them if necessary. Changes have to be made in the
PLC-program.