background image

FT390 Series Trailer Mounted Dual Sockets

 

877.582.3569              FT390 SERIES 

 

 

PRODUCT DESCRIPTIONS: 

 

These instructions cover the following FloTech products:  
FT390 Basic Dual Socket  
FT390G Dual Socket with Ground Bolt Installed  
FT390GT Dual Socket with Ground Bolt and Trailer I.D. Module 
Installed  
FT390Pxx Plug & Play Version  
FT390V Basic Dual Socket 

– Vertical Mounting  

FT391 Dual Socket with 4J Slots on Optic & Thermistor  
FT391G Dual Socket with 4J Slots on Optic & Thermistor & Ground 
Bolt Installed  
FT391GT Dual Socket with 4J Slots on Optic & Thermistor & Ground 
Bolt & Trailer I.D. Module Installed  
FT391V Dual Socket with 4J Slots on Optic & Thermistor 

– Vertical 

Mounting  
FT391VG Dual Socket with 4J Slots on Optic & Thermistor, Ground 
Bolt Installed 

– Vertical Mounting  

FloTech sockets are mechanically and functionally compatible with 
API 1004 Cargo Tank Bottom Loading Recommended Practice.  
 

INSTALLATION 

 

Sockets are to be mounted on the same side of the trailer as the 
bottom loading equipment. Sockets are normally located within 3 feet 
of the bottom loading adapters so the rack plug and cord will reach the 
socket without over stretching the cord. Use the socket body as a 
template to drill four 5/16" holes as shown in Diagram 1. Mount the 
socket body to the trailer using four 5/16" bolts and lock washers. 
 

DIAGRAM 1 

Отзывы: