10158 REV F 2016/08/31
877.582.3569
5
FT300 SERIES TRAILER MOUNTED SOCKETS
DIAGRAM 2 (CONTINUED)
Страница 1: ...800 00 DIXON 34966 Fax 01 81 8354 8197 E mail contactenos dixonvalve com mx Canada Dixon Group Canada Limited Innisfil Barrie Ontario Phone 705 436 1125 Fax 705 436 6251 Toll Free 877 963 4966 E mail...
Страница 2: ...INSTRUCTIONS Sockets are to be mounted on the same side of the trailer as the bottom loading equipment Sockets are normally located within 3 feet of the bottom loading adapters so the rack plug and c...
Страница 3: ...NPT openings Use FloTech FT402 NPT cable glands to ensure a water tight seal Unused conduit openings must have a NPT pipe plug installed Use pipe dope on all NPT threads to ensure a water tight seal F...
Страница 4: ...V F 2016 08 31 877 582 3569 4 FT300 SERIES TRAILER MOUNTED SOCKETS DIAGRAM 2 If your socket contains an installed grounding device install the free end of the device under one of the mounting screws a...
Страница 5: ...10158 REV F 2016 08 31 877 582 3569 5 FT300 SERIES TRAILER MOUNTED SOCKETS DIAGRAM 2 CONTINUED...