
20
Hose routing 2×7 litre version
Two 7 litre diluent tanks are clamped in the frame with valves upwards, connected to each
other by a flexible manifold . The two first stages of the Apeks DST are fitted with technical
connections, and are positioned vertically, connections downwards .
Right post diluent first stage
• The high-pressure hose from the pressure gauge runs crosswise behind the head to the left
side of the diver, where it is clamped into the D-ring on the belt .
• The 350 mm long ADV hose runs crosswise under the exhalation hose to the ADV T-piece
• The 665 mm long inflator hose runs crosswise under both corrugated hoses to the inflator
hose on the left
• The long hose runs straight down from the bottom port and is fitted with a second APEKS
stage
Содержание LIBERTY HEAVY
Страница 1: ...MANUAL LIBERTY HEAVY...