![DIVERSIFIED Large Vent 44x12 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/diversified/large-vent-44x12/large-vent-44x12_owners-manual_2510582010.webp)
8c. Torque Tube Installation (Optional)
Our Torque Tube is available in 20’ lengths with swaged ends to provide any required
length. Install one each Bushing Bracket with each Vent. The Brackets must be placed at
a framed area to ensure the attaching screws go into the frame structure. Run the Tube
through the Brackets as shown. We recommend a maximum of 15 Ft of Torque Tube
between Brackets.
Torque Tube Brackets must be a
minimum of 4 inches above the top of the window
frame
to ensure clearance of the Vent door when opening.
Torque Tubes may also be installed along the ceiling if sidewall height is limited.
Bushing Bracket
Minimum
4 inches
Note: By adding a second Torque Tube you can then Automate the
Brooding Zone Vents to operate independently. This will require an
additional Drive, but gives you the option to operate any selected Vents
automatically and eliminates having to manually lock them closed at
Brooding times.
Содержание Large Vent 44x12
Страница 1: ...Owners Manual Rev 6 20 Vent System...