JT100/JT100 All Terrain Operator’s Manual
Transport - 111
Haul
Haul
Load
1.
Fasten and adjust seat belt.
2.
Start drilling unit engine.
3.
Move drilling unit to rear of trailer and align with ramps or center of trailer bed.
4.
Ensure shuttle guard is up.
5.
Move shuttles in.
6.
Move carriage forward as far as the shuttles will allow.
7.
Keep anchor low to the ground.
8.
Slow engine to low throttle and slowly drive unit onto trailer.
9.
Lower stabilizers to trailer floor.
10. Lower drill frame to trailer floor.
11. Stop engine when unit is safely positioned on trailer bed.
12. Attach tiedowns to drilling unit where tiedown decals are located.
Crushing weight could cause death or serious injury. Use
proper procedures and equipment or stay away
274-204
.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Incorrect loading can cause trailer swaying.
•
Attach trailer to vehicle before loading or unloading.
•
Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help
prevent trailer sway.
Содержание JT100
Страница 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Страница 23: ...Safety 22 JT100 JT100 All Terrrain Operator s Manual Machine Safety Alerts Machine Safety Alerts...
Страница 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Страница 193: ...Service 192 JT100 JT100 All Terrain Operator s Manual Service and Lubrication Overview Service and Lubrication Overview...
Страница 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Страница 254: ...JT100 JT100 All Terrain Operator s Manual Service Record 253 Service Record Service Performed Date Hours...
Страница 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Страница 258: ......
Страница 259: ......
Страница 260: ...JT100 JT100 All Terrain Operator s Manual Appendix 259 Appendix Chapter Contents Engine Diagnostic Codes...