displayit GRAFFITY:PLUS Скачать руководство пользователя страница 2

3-piece channel bar

Snap

Frame Lock

1. Set the frame standing on end. Grasp 
two of the middle hubs (circled in 
orange) and gently expand the frame. 
Note the location of the adjustable feet 
for future reference.

4A. Slide one end of the first channel 
bar onto the connection point of one 
of the corner hubs. The triangular 
channel bar’s thinner edge goes 
toward the inside of the frame.

4B. Snap the slots in the back of the 
channel bar onto the nubs on the hubs.

4C. Attach the other end of the 
channel bar to the other corner hub. 
Repeat steps 4A-4C for all channel 
bars as seen in the diagrams above.

2. Snap all frame locks (marked 
in red in the diagrams below) to 
secure the frame. 

 
It is recommended to assemble 
the frame with it laying on its back.

3. Unfold and slip together each 
bungeed channel bar.

Adjustable Feet

5 Foot Frame

8 Foot  Frame

10 Foot  Frame

4-piece channel bars

3-piece channel bars

3-piece channel bars

3-piece channel bars

2-piece channel bars

3-piece channel bars

Corner Hub

Thinner Edge

Slot

Nub

displayit.com        800.207.0311        After-Hours Emergency: Call or Text 678.723.5343

10x10 Inline Display Kit A

Assembly Instructions

Updated 3/15/2019

GRAFFITI:Plus

2

Содержание GRAFFITY:PLUS

Страница 1: ...displayit com 800 207 0311 After Hours Emergency Call or Text 678 723 5343 10x10 Inline Display Kit A Assembly Instructions Updated 3 15 2019 GRAFFITI Plus 1...

Страница 2: ...he channel bar to the other corner hub Repeat steps 4A 4C for all channel bars as seen in the diagrams above 2 Snap all frame locks marked in red in the diagrams below to secure the frame It is recomm...

Страница 3: ...hooks 90 degrees 9 Rotate the hooks to face the same direction as the LED lenses 10 Hang the curtain lights on the frame with the LED lenses facing forward The hooks have an internal spring to allow...

Страница 4: ...lector Begin by tucking the corners and midway across the top and bottom The stitched edge of the silicone goes into the SEG channel first 13B Complete installation of the fabric DO NOT connect more t...

Страница 5: ...one welt into the SEG groove The stitched ege goes into the groove first Stitched edge goes in first SEG groove Start in the corner Installing Fabric Graphics with Endcaps A Tuck the graphic into left...

Страница 6: ...c Backlit graphic frames black will also include a blockout graphic for the back of the frame to prevent light bleed Graphic Layout Panel A Panel B Blockout Panel displayit com 800 207 0311 After Hour...

Страница 7: ...s and should only be placed after the graphics have been installed Please reference the frame drawing above for the U Connector locations Note The U Connectors will only be used on the top of the fram...

Страница 8: ...ides of the frame Diagram showing the locations of the channel bars required 7 With the up sticker facing toward the top of the frame mount the clips to the frame so the hooks are facing outward Stret...

Страница 9: ...come damaged CORRECT INCORRECT End hooks may break 1 Disconnect and remove each curtain light Twist Arrow A and and rotate Arrow B each hook for storage 2 Carefully bundle each curtain as seen above M...

Отзывы: