8
Assembly
Handlebar and Contol Assembly
1. Hex bolts and nylon lock nuts have been provided in a
hardware package. Align the two holes at each end of the
handlebar with the two holes in the handlebar support on
the snow thrower. Push hex bolts through from the outside
and secure with a nylon lock nut on the interior in two
places on both sides of the snow thrower (see Figure 1).
2. Attach the drive wire on the left side of the snow thrower
(see Figure 2). The spring mechanism should allow the
wire to stretch for connection. The wire on the connection
ring should slide through the attached pulley. Loosen the
nut on the threaded screw with pliers to extend the spring
wire. After connecting the wire rethread the screw as much
as possible and tighten the nut. The wire should be taught
when connected. (See Control Wire Adjustment, page 23).
3. Attach the auger wire on the right side of the snow thrower
(see Figure 3). The spring mechanism should allow the wire
to stretch for connection. Loosen the nut on the threaded
screw with pliers and unthread slightly to extend the spring
wire. After connecting the wire rethread the screw as much
as possible and tighten the nut. The wire should be taught
when connected. (See Control Wire Adjustment, page 23).
4. Attach the speed shift rod and secure with a r-clip that has
been included in the hardware package (see Figure 3).
Attaching the Chute Direction Control Cable
1. Attach the chute direction control cable to the chute
direction handle by threading onto the recptacle
underneath the control panel (see Figure 4).
Attaching the Shift Lever Handles
1. Thread the shift lever handles on to the shift lever rods, one
for the speed shift and one for the tilt control.
HEX BOLT & NYLON
LOCK NUT
(4 PLACES)
DRIVE
WIRE
Figure 2
Figure 1
AUGER
WIRE
Figure 3
SPEED
SHIFT ROD
CONNECTION
RING
R-CLIP
Figure 4
CONTROL
CABLE
CHUTE
DIRECTION
CONTROL
HANDLE