Page 89
AIM 2 Operation Manual
Performing a SWiM LF Power Test
You can use the AIM’s SWiM LF Power test feature to determine whether there is a
communications problem between the SWiM and the IRD. To perform this test, disconnect all
IRDs in the distribution network, then connect the AIM in place of an IRD. The AIM determines
whether the SWiM LF Power level is sufficient.
1.
Set up the job for the installation. See the
Starting a Job
section in
Chapter 5
.
2. From the
HOME
screen, press
TEST
to go to
the
TEST
screen.
3. Highlight
SWiM LF Power Test
and press
SELECT
to go to the
SWiM LF POWER TES
T
screen.
6. On the
SWiM LF POWER TEST RESULTS
screen, review the results of the test.
The screen shows whether the SWiM LF power
level is sufficient.
7. Troubleshoot any problems following the
instructions provided by DIRECTV.
To repeat the SWiM LF Power test in case of a
failure, press
RETRY
.
8. Press
DONE
to return to the
TEST
screen.
4. Disconnect all IRDs in the distribution network.
Then connect the AIM in place of an IRD.
5. Press
NEXT
and wait briefly for the results of
the test.
Содержание Advanced Installation Meter 2
Страница 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 108: ...Made in U S A ...