29
5.
OPERATING INSTRUCTIONS
5.1. START-UP
Before operating the lift, perform all daily maintenance measures listed in the maintenance
schedule.
DANGER
WARNING
CAUTION
NOTICE
The operator must do a worksite inspection and daily maintenance:
• at the beginning of each workday
• before operating the lift at a new worksite
• when the operator changes in the middle of a workday
5.1.1.
Worksite inspection
1. General information
• Is the lift suited for the intended job?
•
Is the performance of the lift sufficient for the job? (reach, loadability etc.)
• Is the position of the lift safe?
•
Is the lighting on the worksite sufficient?
2. Documents
• Are the Operation and Service Instructions for this lift present? (Manufacturer´s
instructions)
• Are inspections and servicing carried out in accordance with the instructions and
have the defects affecting the safety been checked as repaired?
•
(Inspection protocols)
3.
Structure (Visual inspection and operational test)
• General condition of the lift
• Operation and protection of the controls
• Emergency stop, signal horn and limit switches
• Electrical appliances and wiring
• Oil leaks
• Load markings and signs
4. Operator
• Is the operator old enough?
• Has the operator recieved the required training?
5. Special issues on the worksite
• Are there any additional regulations relevant to the worksite or the work?
Содержание 10196
Страница 2: ......
Страница 3: ...3 TRANSLATION OF THE ORIGINAL INSTRUCTIONS Valid from serial number 105TL 10196...
Страница 6: ...6 Operating instructions DINO 105TL BLANK...
Страница 10: ...10 Operating instructions DINO 105TL 2 1 DIMENSION DRAWING...
Страница 46: ...46 Operating instructions DINO 105TL NOTES...
Страница 47: ...47 NOTES...
Страница 51: ...51 7 2 LUBRICATION PLAN 5 8 6 10 7 5 4 2 1 11 3 9 12...
Страница 55: ...55 BLANK...
Страница 56: ...56 Operating instructions DINO 105TL BLANK...
Страница 58: ...58 Operating instructions DINO 105TL NOTES...
Страница 59: ...59 NOTES...