www.dimplex.de
EN-5
English
6.1
4.3.2 Hydraulic and electrical integration
of the thermal energy meter
The thermal energy meter requires two measuring devices for
data acquisition.
A measuring tube for the flow measurement
This must be installed in the heat pump flow (observe flow
direction).
A temperature sensor (copper pipe with immersion sleeve)
This must be installed in the heat pump return.
The installation locations for both measuring tubes should be as
close to the heat pump as possible in the generator circuit.
To avoid eddying effects which could lead to incorrect measure-
ments, there should be a gap of 50 cm between the measuring
devices and other installed components such as pumps or
valves.
5 Transport
ATTENTION!
When transporting the heat pump, ensure that it is not tilted more than
45° (in any direction).
Use a wooden pallet for transporting the heat pump to the final in-
stallation location. The basic device can be transported with a lift
truck, hand truck or by means of 3/4" pipes fed through the holes
in the base plate or frame.
ATTENTION!
The heat pump and transport pallet are only joined by the packing film.
Before using the transport holes in the frame, it is necessary to
remove the lower side panel assemblies. This is done by loosen-
ing each of the two screws at the base and then withdrawing the
panels by unhooking them from above. Rehang the panels by
gently pushing them in an upwards direction.
Be careful not to damage any components when inserting the
pipes through the frame.
6 Set-UP
6.1 General Information
The heat pump is designed for installation in a corner. Other in-
stallation locations are also possible in combination with an air
duct (available as an accessory) on the air outlet side.
The unit must be installed indoors on a level, smooth and hori-
zontal surface. The entire base of the frame should lie directly on
the floor to ensure a good soundproof seal. If this is not the case,
additional sound insulation measures may be necessary. If the
device is installed on top of a built-under buffer tank, a surface
that fully supports the base is required. The heat pump must be
installed so that maintenance work can be carried out without
being hindered. This can be ensured by maintaining a clearance
of 1 m in front and to the left of the heat pump.
The side panel
assemblies must not be covered by connecting pipes.
Never install the device in rooms subject to high humidity. Con-
densation can form on the heat pump and air circuit if the humid-
ity exceeds 50% and the external temperature is below O °C.
Neither frost nor temperatures higher than 35°C must occur in
the installation location at any time of the year.
/13(
9+]
1,';
9$&
7KHUPDOHQHUJ\PHWHUFDVLQJHOHFWURQLFV
LQWKHKHDWLQJIORZ
LQWKHKHDWLQJUHWXUQIORZ
3XOVHWKHUPDOHQHUJ\PHWHU
Opening the cover
Closing the cover
P
P
Содержание LI 9TE
Страница 2: ......
Страница 16: ...D 14 Deutsch 13 ...
Страница 42: ...FR 14 Français 12 ...
Страница 48: ...A VI Anhang Appendix Annexes 3 2 3 2 Last Load Charge ...
Страница 49: ...www dimplex de A VII Anhang Appendix Annexes 3 3 3 3 Anschlussplan Circuit Diagram Schéma électrique ...