Electrical connection

All products are fi tted with a microprocessor control. Electrical 
power and control connections are made as shown in 

Fig. 6 & 7

A suitable local isolating switch must be provided in the electrical 
supply circuit with at least 3mm clearance on each pole.  In order 
to access the electrical connections, remove the inlet grilles (see 
‘x’ in 

Fig. 3

). Remove the front panel (see ‘z’ in 

Fig. 3

) and also 

remove the mains cover plate (see ‘y’ in 

Fig. 3

).

ARC Electric Models

Feed an appropriate supply cable as shown in 

Fig. 4

 and attach 

to the terminal block (see ‘a’ in 

Fig. 4

). 

Note: Ensure that cables are secured to the cable tray with fi xing 
ties to avoid contact with the elements.  

ARC Water/Ambient Models

Feed an appropriate supply cable as shown in 

Fig. 5

 and attach 

to the terminal block (see ‘a’ in 

Fig. 5 

and 

Fig. 7

).  

A suitable cable for a switch panel (kit ref. - CABC5 for electrically 
heated models or CABC6 for water heated/ambient models) can 
be similarly introduced through the top panel and connected to 
the circuit board.
If the unit is to be operated in conjunction with a door switch, a 
normally closed switch should be wired (see ‘D’ in 

Fig. 6 & 7

) as 

appropriate.  

Note

: If using a door switch, an additional 2 core 

(low Voltage) cable is required between the door switch and the 
air barriers. 
If the unit is to be connected to a Building Energy Management 
System, connections to be made (see ‘S0, S1, S2’ in 

Fig. 6 & 7

as appropriate.
Ensure that the air curtain is securely fastened in position and 
that the supply cables are fi rmly clamped before operating the 
appliance.

Water connection

Models designed for use in conjunction with a low pressure hot 
water supply should be individually connected (in a parallel circuit) 
to the fl ow and return pipe-work.
Connections (see ‘a’ in 

Fig. 8

) and isolation valves (see ‘b’ in 

Fig. 

8

) should be fi tted as close to the air curtain connection points as 

possible.   Care should be taken to release as much air as possible 
to prevent air locks.  
Maximum water supply conditions are 100ºC and 10 bar 
(1.03MPa).

Switch Panel Installation

The backing box (standard double gang) should be rebated
into a suitable wall. The box should be fi tted so that the switch panel 
will be fl ush with the wall. Suitable conduit should be used where 
applicable to carry the cable between the heater and the switch. 
An RJ45 Patch cable with straight through connections should be 
used to connect the switch panel to the appliance PCB.

Warning: 

Ensure cable is secure and the cable path does not 

come into contact with heater element or other moving parts. Test 
all switch settings once installation is complete.

Electrically heated variants

Operation using switch box - CABC5

Switch on electrical supply to the air curtain. Rotate the switch to 
the desired heat setting. Settings available are;

 
 OFF
 Low 

Fan

 

Low Fan with Low Heat

 High 

Fan 

 

High Fan with Low Heat

 

High Fan with Full Heat

The rocker (auto / manual) switch allows for manual over-ride of 
a door switch if fi tted. Manual allows the appliance to run at the 
desired setting, while Auto provides an energy saving feature by 
shutting down the appliance while the door is closed.

The unit should always be switched OFF using the switch box 
control, and not by mains power supply interruption.

When the unit is switched off (via the switch box) the fan will run 
on for 1 minute without heat to discharge any residual energy from 
the heating elements.
When fi rst turned on the control will run through a system check. 
The selected settings will be reached and maintained after a 30 
second period.

Door switch control (Electric models)

By including a door switch in the circuit (as per ‘D’ in 

Fig. 6 

or 

Fig. 

7

) the air curtain will respond to door openings as follows:

(1) Door opening will energise the air curtain at the set conditions 
(switch box settings).
(2) On door closure operation will continue at the set conditions 
for a further 1 minute.
(3) Between 1 minute and 2 minutes from door closure, set back 
operation, ½ heat (if heat selected) and ½ fan will activate.
(4) Between 2 minutes and 3 minutes, the fan only (½ speed) shut 
down cycle will be engaged.
(5) After 3 minutes, the air curtain will return to a dormant state 
until the door is re-opened.
If the door re-opens during this 3 minute run on cycle, the
process will restart at (1).

Содержание ARC10A

Страница 1: ...h may be of use to you and is available 24 hours a day It includes Operating and installation instructions Easy How to use guides for storage heaters Service and repairs Where to buy our products Literature downloads Heating requirement calculator Visit www dimplex co uk support A division of GDC Group Ltd Millbrook House Grange Drive Hedge End Southampton SO30 2DF www dimplex co uk Registered No ...

Страница 2: ...ds EN60335 2 30 and the European Standard Electromagnetic Compatibility EMC EN55014 EN60555 2 EN60555 3 These cover the essential requirements of EEC Directives 2006 95 EC and 2004 108 EC ARC10E ARC15E ARC20E ARC10W ARC15W ARC20W ARC10WLT ARC15WLT ARC20WLT ARC10A ARC15A ARC20A ...

Страница 3: ...a 1 2 3 4 5 500 min H L A L W H A B ARC10 E W A 1106 360 450 1060 175 ARC15 E W A 1606 360 450 1560 175 ARC20 E W A 2212 360 450 2160 175 W B C 50mm s y x z a ...

Страница 4: ...7 6 9 ARC E ARC W ARC A b a 8 ...

Страница 5: ...he room on their own unless constant supervision is provided WARNING Isolate electrical supply to ALL modular linked units when carrying out maintenance Architectural Air Curtains Models ARC10E ARC15E ARC20E ARC10W ARC15W ARC20W ARC10WLT ARC15WLT ARC20WLT ARC10A ARC15A ARC20A Electrical The installation of this appliance should be carried out by a competent electrician and be in accordance with th...

Страница 6: ...witch Panel Installation The backing box standard double gang should be rebated into a suitable wall The box should be fitted so that the switch panel will be flush with the wall Suitable conduit should be used where applicable to carry the cable between the heater and the switch An RJ45 Patch cable with straight through connections should be used to connect the switch panel to the appliance PCB W...

Страница 7: ... the heat output on water heated models 3 An electrical 3 Port Solenoid Valve can also be connected into the system Please contact your service agent using the contact details for more details Door switch control Water heated Ambient models By including a door switch in the circuit as per D in Fig 8 the air curtain will respond to door openings as follows 1 Door opening will energise the air curta...

Страница 8: ... for recycling advice in your country After Sales Service Your product is guaranteed for two years from the date of purchase Within this period we undertake to repair or exchange this product free of charge provided it has been installed and operated in accordance with these instructions Your rights under this guarantee are additional to your statutory rights which in turn are not affected by this...

Страница 9: ...nts of EEC Directives 2006 95 EC and 2004 108 EC DIMPLEX MILLBROOK HOUSE GRANGE DRIVE HEDGE END SOUTHAMPTON SO30 2DF TEL 0845 600 5111 FAX 01489 773050 WEBSITE www dimplex co uk Republic of Ireland Tel 01 8424833 GDC Group Ltd All rights reserved Material contained in this publication may not be reproduced in whole or in part without prior permission in writing of GDC A division of GDC Group Ltd ...

Отзывы: