Installation Precautions
Installation Precautions
The projector must be installed only by suitably qualified personnel, in accordance
with local building codes.
The projector is heavy. Use safe handling techniques when lifting the projector.
Do not drop or knock the projector.
Do not install the projector close to anything that might be affected by its
operational heat, for instance, polystyrene ceiling tiles, curtains etc.
Place the projector in a dry area away from sources of dust, moisture, steam,
smoke, sunlight or heat.
Ensure that the intake vents do not recycle hot air from the exhaust vent.
When operating the projector in an enclosed space, ensure that the surrounding air
temperature within the enclosure does not exceed operation temperature while the
projector is running, and the air intake and exhaust vents are unobstructed.
All enclosures should pass a certified thermal evaluation to ensure that the
projector does not recycle exhaust air, as this may cause the device to shutdown
even if the enclosure temperature is with the acceptable operation temperature
range.
Avoid installing at high temperature, insufficient cooling and heavy dust locations.
Keep your product away from fluorescent lamps (>1 Meter) to avoid malfunction
caused by IR interference.
Avoid installing near an air conditioner duct or a subwoofer.
The projector should be installed as close to the power outlet as possible.
The power connection should be easily accessible, so that it can be disconnected in
an emergency.
Please pay attention to projector installation with respect to other staging laser light
equipment set-up. These systems can cause permanent damage to the DMD
imaging devices used in our projectors. This damage is not covered by our
warranty.
When using projectors in environments with third party high power laser systems
avoid direct laser beams pointing towards the projection lens. This may cause
incident light to converge into the optical engine and cause damage to the DLP
DMD.