
11
Verify Server Is Operating Correctly
When you plug in the power cable, the server
runs tests. After the tests are completed, the
server requests a down-line load of software.
The 7-segment display alternates between 3
and 4 until the software is loaded. Allow 3
minutes for the server to complete the proce-
dure.
Compare the 7-segment display and the Sys-
tem OK LED status to the table on page 12.
LKG-5828-91l
7-Segment
display
System
OK LED