Digital Equipment DEC LANcontroller 601 Скачать руководство пользователя страница 4

For details of tests and procedures, refer to the panel with the matching  flag (see overleaf).

 

 

 

C

C

C

Check the LED display on
the processor card, then see
the Installation and Service
Manual
 for your DECNIS.

The ATTENTION state was
shown because the Ethernet
was not properly connected.

Does the

FAULT LED

go out?

There is a possible problem
with the NIC.

No

Yes

Test

successful?

(READY state)

Replace the Ethernet
cable.

The fault is either at the
Ethernet connection device
or the Ethernet – see the
appropriate manuals.

Check the Ethernet cable
is properly connected.

Wait for 2–3 minutes.

No

Test

successful?

(READY state)

Yes

Yes

Yes

Test

successful?

(READY state)

There is a possible problem
with the NIC.

C

No

Replace the Ethernet
cable.

No

LKG–5733–91I

Test

successful?

(READY state)

No

Yes

or

ATTENTION

READY

FAULT

Fast Flicker

A

Complete the module
loopback test on the
Ethernet cable.

B

Perform a module loopback
test on the Ethernet cable.

A

Complete the module
loopback test on the NIC.

B

Perform a module loopback
test on the NIC.

Problem Solving Flowchart – note the NIC LED   state   and follow the procedure indicated

4

Содержание DEC LANcontroller 601

Страница 1: ...Problem Solving DEC LANcontroller 601 Part Number EK A0554 PS 001 Digital Equipment Corporation 1992 All Rights Reserved 1...

Страница 2: ...chart DECNIS Installation and Service Manual includes a problem solving section which describes procedures for checking hardware problems Loopback Connectors H4080 Part Number DEC Network Integration...

Страница 3: ...Module self test in progress The NIC is either waiting to load or is load ing software The NIC has passed its module self test and has successfully loaded the software The NIC is disabled The NIC swit...

Страница 4: ...ection device or the Ethernet see the appropriate manuals Check the Ethernet cable is properly connected Wait for 2 3 minutes No Test successful READY state Yes Yes Yes Test successful READY state The...

Страница 5: ...passes the LEDs will show the READY state If the test fails the LEDs will show the ATTENTION or FAULT state NIC Ethernet cable NOTE If loading has been dis abled for this slot the READY LED will not s...

Страница 6: ...READY LED stops flashing max 2 min 5 Observe the test result on the LED display NOTE If loading has been disabled for this slot the READY LED will not stop flashing To enable the slot see the manual D...

Страница 7: ...in the manual unless you are a service person seetheInstallationandServiceManual foryourDECNIS NIC Ethernet cable Install a new NIC Refer to the Installation and ServiceManual foryourDECNIS DONOTdo th...

Отзывы: