13
Installation/uninstallation of the
front module and the control box
• To avoid an electric shock, prior to instal-
lation/uninstallation of the front module
and the control box, confirm that the PL
unit’s power supply is completely turned
OFF, via a breaker, or similar unit.
1.
Uninstalling the front module and
the control box
(1) Unscrew the three attachment screws to
detach the cover for the flexible cable.
(2) Disconnect the flexible cable.
(3) Remove four screws on the installation
fasteners for the control box.
(4) Slide the control box in direction shown
by the arrow.
(5) Lift the control box and remove the front
module tabs from the slot on the installa-
tion fasteners for the control box. Then
remove the control box.
2.
Installing the front module and the
control box
Install the control box to the front module
in the reverse order of the uninstallation
steps. The necessary torque is 0.5N•m to
0.6N•m in every step.
Flexible Cable
Cover
Flexible Cable
Use the bridge
position as a guide.