background image

 

 

Installation 

The controls, connectors and LEDs for the SPKR-IP-CS are located on a 
faceplate on top of the speaker.  There is also a green LED in the speaker grill 
that matches the state of the 

Ready

 LED. 

 
Please note, the SPKR-IP-CS can be configured before being installed. 

 

 

 

 

Connect the SPKR-IP-CS ceiling speaker to a PoE (802.3af) 
network cable.  The SPKR-IP-CS will power up within 5 seconds 
and request 15.4 watts from the Power Source Equipment  

 

The red 

Link

 LED will turn solid 

 

The red 

Ready

 LED will flash 4x per second 

 

Record the 

ID#

 from the label on back of the SPKR-IP-CS for use 

during software configuration.   

 

Optionally, label the speaker grill with one of the extra 

ID# 

labels 

included in the box 

 

Install the connected Speaker in a 2’x2’ ceiling grid and verify that 
the green 

Ready

 LED in the speaker grill is on solid 

 

Please refer to the 

SPKR-IP-CS_ReferenceManual

 available at 

https://www.digitalacoustics.com/support/ip7-hardware-talkmaster-
software-manuals/ for information on installation and setup of 
optional accessories 

 

 

 

 

 

Отзывы: