Installation
The controls, connectors and LEDs for the SPKR-IP-CS are located on a
faceplate on top of the speaker. There is also a green LED in the speaker grill
that matches the state of the
Ready
LED.
Please note, the SPKR-IP-CS can be configured before being installed.
•
Connect the SPKR-IP-CS ceiling speaker to a PoE (802.3af)
network cable. The SPKR-IP-CS will power up within 5 seconds
and request 15.4 watts from the Power Source Equipment
•
The red
Link
LED will turn solid
•
The red
Ready
LED will flash 4x per second
•
Record the
ID#
from the label on back of the SPKR-IP-CS for use
during software configuration.
•
Optionally, label the speaker grill with one of the extra
ID#
labels
included in the box
•
Install the connected Speaker in a 2’x2’ ceiling grid and verify that
the green
Ready
LED in the speaker grill is on solid
•
Please refer to the
SPKR-IP-CS_ReferenceManual
available at
https://www.digitalacoustics.com/support/ip7-hardware-talkmaster-
software-manuals/ for information on installation and setup of
optional accessories