background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DG-GS4600 SERIES 

24/48 PORT ACCESS LAYER 3 SWITCH 

Installation Guide 

 

V1.0 

2013-05-22 

 

As our products undergo continuous development the specifications are subject to change without prior notice 

Содержание DG-GS4600 SERIES

Страница 1: ...DG GS4600 SERIES 24 48 PORT ACCESS LAYER 3 SWITCH Installation Guide V1 0 2013 05 22 As our products undergo continuous development the specifications are subject to change without prior notice...

Страница 2: ...nstallation 2 1 2 1 Installation Notice 2 1 2 1 1 Environmental Requirements 2 1 2 1 2 Installation Notice 2 4 2 1 3 Security Warnings 2 5 2 2 Installation Preparation 2 5 2 2 1 Verify the Package Con...

Страница 3: ...BO ports and 2 1000Mb optical ports DG GS4652 has 52 fixed ports 48 10 100 1000Base T fixed ports and 4 1000Mb optical ports DG GS4628HP has 30 fixed ports 24 10 100 1000Base T fixed ports 2 1000Mb CO...

Страница 4: ...rdware release DG GS4628HP Fig 1 3 DG GS4628HP switch DG GS4652 Fig 1 4 DG GS4652 switch 1 2 Physical Specifications Management Port 1 RJ 45 serial console port AC DC Power Input AC 100 240VAC 50 60Hz...

Страница 5: ...Combo ports 2 RJ 45 and 2 SFP 1 Console port 1 USB port 14 LEDs and 1 220V AC power socket The front panel of DG GS4610 is shown below Fig 1 5 Front Panel of DG GS4610 DG GS4628 has 24 10 100 1000Base...

Страница 6: ...orts and 52 LEDs The front panel of DG GS4652 is shown below Fig 1 8 Front Panel of DG GS4652 1 3 2 Back Panel The back panel of DG GS4610 is shown below Fig 1 9 Back Panel of DG GS4610 DG GS4628 DG G...

Страница 7: ...t indications description Panel Symbol Status Description Port1 10 Link Act On Green ports are in successful link state of 10M 100M or 1000M Flash Green ports are in successful link state and receive...

Страница 8: ...uccessful link state of 10M 100M or 1000M Flash Green ports are in successful link state and receive send data Off ports are not in link Port25 26 SFP Link Act On Green ports are in successful link st...

Страница 9: ...ports are in successful link state and receive send data Off ports are not in link Port25 26 SFP Link Act On Green ports are in successful link state of 100M or 1000M Flash Green ports are in success...

Страница 10: ...successful link state of 10M or 100M and receive send data Off ports are not in link GE Port49 52 Link Act On Green ports are in successful link state of 1000M Flash Green ports are in successful link...

Страница 11: ...how port POE status Enabled POE status Table 1 7 DG GS4628HP PoE indication description LED Status Description PoE Green Port is in power state Flash Green POE is in maximum power state Off Port power...

Страница 12: ...transceiver 9 125um single mode fiber 70km SFP LH 120 L transceiver 9 125um single mode fiber 120km SFP GT SFP GT module 1000Base T SFP interface card module RJ 45 port SFP FX SFP FX 100Base FX SFP i...

Страница 13: ...well grounded in order to avoid ESD damage and physical injury of people The switch should avoid the sunlight perpendicular incidence Keep the switch away from heat sources and strong electromagnetic...

Страница 14: ...low relative humidity may cause the insulation spacer to contract making the fastening screw insecure Furthermore in dry environments static electricity is liable to be produced and cause harm to int...

Страница 15: ...y system The input source for the switch should be reliable and secure a voltage adaptor can be used if necessary The building s circuit protection system should include in the circuit a fuse or circu...

Страница 16: ...entilation for the rack Every device in the rack will generate heat during operation therefore vent and fans must be provided for an enclosed rack and devices should not be stacked closely When mounti...

Страница 17: ...e switch alone in a dangerous situation Use standard power sockets which have overload and leakage protection Inspect and maintain the site and the switch regularly Have the emergence power switch on...

Страница 18: ...lities by themselves 2 3 Installation Guide 2 3 1 Installing the Switch Please mount DG GS4600 series switch as below 1 Attach the 2 brackets on the DG GS4600 series with screws provided in the access...

Страница 19: ...tch Do not place anything on top of the switch Do not block the blowholes on the switch to ensure the proper operation of the switch 2 3 2 Connecting Console DG GS4600 series provides a serial RJ45 co...

Страница 20: ...snap into place at the bottom of the line card Note the SFP transceiver is hot swappable Caution Do not stare directly at the 2 fiber bore in the SFP transceiver when the switch is in operation other...

Страница 21: ...ndicates that the link has been established otherwise the link is not ready and should be examined Caution Please verify the sign above the port to ensure using the other ports Connecting to wrong por...

Страница 22: ...djustable for the input voltage As soon as the input voltage is in the range printed on the switch surface the switch can operate correctly 3 When the switch is powered on it executes self test proced...

Отзывы: