Electronic Component Distributor. Source::Digi International
P.N:ERT-X2-SE1-BD1 Desc:BUNDLE X2 GATEWAY GRID NOW AMR+
Web:http://www.hotenda.cn E-mail:[email protected] Phone:(+86) 075583794354
Step 2 -
(continued)
Connect the remaining power supply to the ERT/Smart Energy bridge and plug it into an outlet.
Verify that the LEDs on the top of the
ERT/Smart Energy bridge are operating.
The Association LED should be solid amber,
the Power LED should be solid green, and the
ERT Status LED will be off until online
installation is complete.
See the Troubleshooting section for further
details about the ERT Status LEDs.
d
e
d
NOTE:
Position the ERT/Smart Energy bridge somewhere between your ConnectPort X2e SE and
the meters you wish to monitor. Avoid placing the ConnectPort X2e SE and ERT/Smart Energy
bridge directly next to each other.
e
ERT
Status
Association
Power
Wi-Fi Setup
Power
ZigBee
Network
Button
Connect the power supply
Enable Access Point mode on your device by pressing the button.
NOTE:
After connecting the power supply, the Power LED will be solid
green, the ZigBee LED will be blinking green, and the network LED (WAN)
will be blinking orange. Once the Wi-Fi configuration is complete, the
Network (WAN) LED will change from blinking orange
to solid green.
NOTE:
If the ConnectPortX2e SE has already been configured
to connect to an access point, it will need to be set back to
factory defaults to use the following procedure. Holding the Button
for over 10 seconds after the device is running will return the device
to factory default configuration.
Configure the Wi-Fi interface of your laptop to connect to
the ConnectPort X2e SE gateway’s access point. The name
(SSID) of the access point will be cpx2e-se-xxxxxxxxxx,
where xxxxxxxxxxxx is the serial number of the gateway.
Go to your web browser, and enter the URL of the gateway:
http://192.168.100.1
Navigate to
Configuration > Wireless Wizard
.
Follow the steps in the wizard to configure your device.
a
b
c
d
e
NOTE:
Once the configuration is complete, your device will connect
to your home access point and attempt to connect to
Smartlee. You can track its progress by observing the network
LED behavior. Once the connection to your access point and
gateway is connected to Smartlee, all the LED’s will be solid
green.
Step 3 -
Online Installation
Important:
When using the Router variant of this bundle, the ConnectPort X2e SE and the ERT/Smart Energy Bridge must be successfully joined to a Smart
Energy Network before moving on to step 3a. Please contact the Utility or owner of the Smart Meter (or other Coordinator) if unsure how to add your bundle to
the network. The equipment must be powered ON when being added/removed from a Smart Energy network.
To begin the online installation process:
a
Browse to
www.livesmartlee.com
and sign in to our secure server if you have an existing account, or create an account to get started.
b
Follow the step-by-step instructions to completion.
Congratulations! Following the online installation process, you will be able to track your energy use from anywhere using your smartphone (iPhone or Android) or from an
Internet connection.
2 / 3