Installation & Operation
D3746 19
Assemble load cells to deck as shown on page 25. Make sure
both load cell cables come out the same side as the indicator
support and the cable plate (located under one of the side
channels).
Assemble indicator support, 1” ram mount and handle/wheels
option as shown on page 25. The ram mount should be mounted
on the channel support side which has the cable plate.
Load cell cable routing: Loosen cable retainer plate and push the
plate outward. Begin by taking the two cable load cell connectors
and feed them through the 1.5” diameter hole from the bottom
toward the indicator support, Figure 3. Weave the load cell cable
through the support arm toward the indicator, Figure 4. Attach the
load cell connector to the indicator and pull any excess cable
back down toward the deck.
At each load cell, push the cable through the retaining plate slot,
Figure 1 and Figure 2. All extra cable is tucked inside the deck
channel. When complete, push the cable retaining plate toward
the deck to close off the channel. Tighten the three ¼” bolts to
hold the retaining plate in position.
MAINTENANCE
There are no moving parts and no lubrication required. The only
maintenance required is periodic cleaning of the mounts and the
area below the scale to assure free and unencumbered operation
of the scale. If a pressure washer is being used, do not spray or
direct high pressure stream at the load cells. Load cell damage
may occur.
Stand over each of the 4 corners to troubleshoot for problems.
Corners should weigh the same within ± 1% maximum error.
Содержание SW10,000
Страница 11: ...Installation Operation D3746 11 MODEL 10 000 HYBRID BEFORE JUNE 2009 MODEL 10 000...
Страница 12: ...SW Scale Hardware 12 D3746 MODEL 14 000 HYBRID BEFORE FEBRUARY 2009 MODEL 14 000...
Страница 13: ...Installation Operation D3746 13 SW PLATFORM WRANGLER 90...
Страница 14: ...SW Scale Hardware 14 D3746 SW PLATFORM WRANGLER JR 54...
Страница 15: ...Installation Operation D3746 15 INSTALLATION 10K 14K LOAD CELLS 10K Mount 14K Mount...