![DIGI-STAR EZ400 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/digi-star/ez400/ez400_operators-manual_2496843026.webp)
Installation
22
EZ400 User’s Manual
D3655-US Rev E
Connect Load Cells to J-Box
J-Box Connections
Load Cell Direction
Observe direction of arrow when installing load cell.
Indicator Calibration
If you connect an indicator to a different weighing implement, the calibration
and setup number may need to change. Refer to calibration procedures (see
pages 17-19) or contact your Digi-Star representative for assistance.
Connect load cell
wires to terminal
blocks. See Wire
Color Key
J-Box Illustrated for 4
Load Cell Installation
Tighten Nuts
Load Cell Cable
J-Box Cable
Connect to Indicator
bottom Panel.
Wire Color Key
Color
Description
1 White Signal
+
2 Green Signal
-
3 Red
Excitation
+
4 Black
Excitation
-
5 Shield Shield
All manuals and user guides at all-guides.com
all-guides.com