7
4. Mounting
There are two different mounting types depending on the application and structural conditions.
WARNUNG Injury
Before mounting, please check the stability of the mounting base and then select the screws
(not included). Please check the thermal stability of the building structure (this must be >60°C)
and then select the distance and mounting method of the heating element.
1. Variant No.1 Fixing to the ceiling.
Fix the tabs to the ceiling
2. Variant no.2 Fixing to recess
Fix the tabs to the recess