Dialogic Vision TIGI2U Скачать руководство пользователя страница 6

Installing the Dialogic® Vision™ Server TIGI2U 

Installation overview 

Warning: 

 

Observe the following precautions when handling Vision Server TIGI2U equipment: 

Server power ON/OFF: The push-button on/off power switch on the front panel of the 
server does not turn off the power. To remove power from the server, you must unplug 
the power cord from either the power supply or wall outlet. 

Hazardous conditions 

 

Power supply: 
Hazardous voltage, current, and energy levels are present inside the power supply 
enclosure. 

 

Devices and cables: 
Hazardous electrical conditions may be present on power, telephone, and 
communication cables. Turn off the server and disconnect telecommunications 
systems, networks, modems, and the power cord attached to the server before 
opening it. Otherwise, personal injury or equipment damage can result. 

Maintenance: There are no user-serviceable parts inside the Vision Server TIGI2U 
chassis. Only technically qualified personnel should perform service and maintenance 
tasks. 

Avoid injury: Lifting the server chassis and attaching it to the rack is a two-person job. If 
needed, use an appropriate lifting device. 

 

The following table provides the approximate weight for the Vision Server TIGI2U: 

A Vision Server TIGI2U with... 

Weighs approximately... 

No line card interfaces 

19.5 kg (43 lbs) 

Two line card interfaces 

20.0 kg (44.2 lbs) 

Two line card interfaces and a signaling interface 

20.2 kg (44.6 lbs) 

 

The universal rack mount kit weighs approximately 2.26 kg (5 lbs), and the shipping 

box weighs approximately 3.62 kg (8 lbs). 

 

Caution: 

Temperature: The operating temperature of the server, when installed in an equipment 
rack, must not go below 5 °C (41 °F) or rise above 35 °C (95 °F). Extreme fluctuations in 
temperature can cause a variety of problems in the server. 

Ventilation: The equipment rack must provide sufficient airflow to the front of the server 
to maintain proper cooling. 

Codes and regulations: Ensure that the installation meets all government codes and 
regulations concerning facilities. In addition, all sites where the Vision Server TIGI2U are 
deployed must meet all local, national, and international codes described in Compliance 
statements
 on page 12. 

 

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Содержание Vision TIGI2U

Страница 1: ...Installing the Dialogic Vision Server TIGI2U April 22 2010 64 0404 02 www dialogic com Downloaded from Arrow com...

Страница 2: ...roperty rights owned by third parties Dialogic does not provide any intellectual property licenses with the sale of Dialogic products other than a license to use such product in accordance with intell...

Страница 3: ...AC power cords for AC servers Specified per order Intel Server Deployment Toolkit CD Intel Server universal rack mount kit Installing the Vision Server TIGI2U this document R TTE Declaration of Confo...

Страница 4: ...nks 5 and 7 T1 E1 trunks 6 and 8 Ethernet 1 Ethernet 2 Ethernet 3 Ethernet 4 Line card Dialogic MD1 RJ 45 T1 E1 trunk interfaces Line card RJ 45 Ethernet interfaces Line card Optional line card T1 E1...

Страница 5: ...cription Red LED on Yellow LED off Loss of frame loss of signal or bit error rate Yellow LED on Red LED off Remote loss of frame or remote loss of signaling multiframe Both LEDs on The line card is in...

Страница 6: ...is a two person job If needed use an appropriate lifting device The following table provides the approximate weight for the Vision Server TIGI2U A Vision Server TIGI2U with Weighs approximately No li...

Страница 7: ...Connecting to a T1 network on page 9 6 Connect device trunk interfaces if applicable Connecting T1 E1 trunk and SS7 signaling cables on page 9 After the installation is complete configure the Vision S...

Страница 8: ...cting Ethernet cables To connect to a 10Base T 100Base T or 1000Base T network use two shielded twisted pair STP Category 5 or better Ethernet cables The two 10 100 1000Base T Ethernet connectors prov...

Страница 9: ...g Vision Server TIGI2U The best way to provide a loopback is to unplug the cable from the Vision Server TIGI2U to the CSU The modular connector on most CSUs loops back the transmit signal to the recei...

Страница 10: ...andards Each HSL occupies a full not channelized T1 E1 line and transfers data at the rate of 1 544 2 048 Mbps A single timeslot on a T1 E1 trunk carrying media The H 100 bus delivers the signaling li...

Страница 11: ...rds Trunk connector 1 1 1 2 2 1 3 1 2 4 2 2 5 1 3 6 2 3 7 1 4 8 2 4 1 1 1 2 1 2 3 1 3 4 1 4 If two trunks connect to the physical connector a trunk adapter cable for example P N 32851 is required to s...

Страница 12: ...table Service type Facility interface code Service order code USOC jack type 4 wire 1 544 Mbps DS1 with super frame SF alternate mark inversion AMI no line power 100 ohms 04DU9 BN 6 0N RJ 48C 4 wire 1...

Страница 13: ...lephone lines and internal metallic water pipe system if present are connected together This precaution can be particularly important in rural areas Caution Users should not attempt to make such conne...

Страница 14: ...t to change without notice For purchases not made directly from Dialogic please contact your direct vendor in connection with the warranty period and terms that they offer http www dialogic com warran...

Отзывы: