Diagraph IJ3000 Скачать руководство пользователя страница 5

IJ3000

 

 IJ3000 Flushing System

 

5760-029N 

Revision B

 

 Installation Instructions

 

Page 5 of 10

 

 

© 2008 Illinois Tool Works Inc.  All rights reserved. 

Printed in USA 

 

 

 

Service Part Kit  5760-029 

 

conditioner begins flowing into the effluent bottle, close the shutoff valve and disconnect the 
assembly.  Repeat this step for all of the tee valves. 

8.  Connect the effluent bottle to the ink service port (see diagram A), make sure the effluent bottle 

shutoff valve is off at this time. 

9.  At the IJ3000 controller, close the conditioner valve and open the ink valve.   
10. Open the shutoff valve at the effluent bottle assembly, this will allow air to flow out of the ink trunk 

line.  As soon as ink begins flowing into the effluent bottle, close the shutoff valve and disconnect 
the assembly. 

11. Move the effluent bottle assembly to the first tee valve (5700-509) in the trunk line and connect it.  

Open the shutoff valve at the effluent bottle assembly allowing the air to flow out.  As soon as ink 
begins flowing into the effluent bottle, close the shutoff valve and disconnect the assembly.  Repeat 
this step for all of the tee valves. 

12. Connect each print head regulator to its tee valve. 
13. Go to the “Flush Print Heads” screen at the IJ3000 controller and Flush the print heads with ink 

(reference section “Flushing the system with ink”).  This flushes the conditioner out of the regulator, 
regulator ink lines, and the print head. 

 
 

 Flushing the system with ink

 

1.  Place an absorbent cloth (or some other means of capturing waste ink) in front of each print head 

(includes all print heads on both tasks).  All print heads will automatically purge at the end of the 
flushing sequence. 

2.  At the IJ3000 controller, go to the “Flush Print Heads” screen.  Select the “Flush with ink” radio 

button.

 

 

3.  Set the number of required cycles.  The number of cycles will vary depending on how many print 

heads are connected.  Each cycle adds twelve seconds to the total flushing operation.  By default 
the number of cycles is set to 2 which should be sufficient to flush four 18-dot print heads.  The 
IJ3000 controller will remember the last number of cycles entered. 

 
 
 
 

4. Press 

the 

Start

 button.  A warning dialog box will appear advising of the impending print head purge 

at the end of the flushing operation.  After pressing 

OK

 the ink lines are automatically flushed with 

ink and all of the print heads are purged.  The ink valve will remain open so that normal printing 

Содержание IJ3000

Страница 1: ...be used with a non porous flushing system The flushing system can not be converted to use a different ink type System components Ink IDS3000 identified by its two waste ports in the back of the cover...

Страница 2: ...am below 6 Tighten the bulkhead fittings by hand plus a turn with wrench and replace the IDS covers 7 Place the status beacons where they can be seen by plant personnel Beacons are labeled for easy id...

Страница 3: ...ntains enough tubing and fittings for four additional print heads 1 Create all supply line and waste line tubing see Diagram A Do not connect the print head regulator to the tee valve in the main trun...

Страница 4: ...eed to be repeated as the pump will turn off automatically after 20 cycles 4 A small amount of conditioner ink will now be visible in their respective trunk lines Revert the plumbing at the back of th...

Страница 5: ...lves 12 Connect each print head regulator to its tee valve 13 Go to the Flush Print Heads screen at the IJ3000 controller and Flush the print heads with ink reference section Flushing the system with...

Страница 6: ...et the number of required cycles The number of cycles will vary depending on how many print heads are connected what type of print heads are connected 9 or 18 dot and if all of the print heads are of...

Страница 7: ...ill illuminate steady This lets the operator know that is time to have a new supply tank ready Ink or conditioner out After the float has dropped low and the pump has turned on 60 times the appropriat...

Страница 8: ...ons and when the waste valve is open The conditioner flushing sequence consists of two programming loops that open and close the waste and conditioner valves The first programming loop lasts two minut...

Страница 9: ...o Ambient operating temperature 40 F to 104 F o Operating humidity 10 90 non condensing Tubing Limitations o Maximum horizontal tube length 100 ft o Maximum vertical tube length bottom of IDS to bott...

Страница 10: ...5760 029N IJ3000 Flushing System IJ3000 Page 10 of 10 Installation Instructions Revision B DIAGRAM A DETAIL A...

Отзывы: