background image

www.Diagram3D.com 

Assembly Instructions 

North British Railway (NBR) Perishable Goods (Fish or Milk) Van  4mm scale (“OO” “EM” or “P4”)  

 

© Copyright  2022 Diagram3D, all 
rights reserved  

 

Page 2 

  

 

 

rubber 

bands or “bulldog clips” on the ends of the frame. 

Van Sides 
and ends 
 

Total 
preparation 
and assembly 
time about 10 
minutes. 
 
Allow 
sufficient 
time for the 
adhesive to 
dry 
thoroughly 

 

There are two layers for each side and end. 
 

Layer 

Description 

Layer 1 

Window Frames and droplights, end (no steps) 

Layer 2 

Van side panelling, end panelling (no step detail) 

 

 
Insert these layers into the 

SmartFrame

 in order as described above. Apply 

adhesive and put aside until dry. Now repeat this process for the other side:The 
steps can be attached now in the slots provided. 
 
Hint: The individual layers can be painted in advance to simulate the window 
frames, main body and lining detail.  When thoroughly dry, detach the van sides 
using a sharp craft knife.  

Layer 

Description 

Layer 1 

Window Frames and droplights, end (with steps) 

Layer 2 

Van side panelling, end panelling (with  step detail) 

Chassis 

Total 
preparation 
and assembly 
time about 15 
minutes. 
 
Allow 
sufficient 
time for the 
adhesive to 
dry 
thoroughly 

 

The chassis and superstructure of this model is made from MDF. It comprises a 
floor, two internal partitions, four stretchers for the roof and two solebars. These 
are illustrated below showing their relative positions.  Separate these 
components and ensure that they fit correctly and any unwanted excess 
material has been removed.  
 
 

 

The completed body should look like the image below: 

Hint: Take care to 

ensure that the ends are square. 

 

 

When the assembly is thoroughly dry, the surfaces can be lightly sanded to 
remove any imperfections, ensuring a good fit for the roof, sides and ends.  
 

Glazing & 
Final 
assembly 
 

Total 
preparation 
and assembly 
time about 20 
minutes. 
 
Allow 
sufficient 
time for the 
adhesive to 
dry 
thoroughly 

 

The van sides overlap the MDF chassis and overlap the ends. There is a slight 
indentation in the MDF ends which accommodates the sides and they are also 
notched to match the buffer beams.  Attach the sides and ends to the MDF 
chassis. The long window glazing bars supplied fit into the slots which are pre-
cut into the partitions.The glazing bars are fractionally shorter than the van 
sides  

 

Hint: the glazing can be delayed until the van is painted by the modeller. 
The long glazing bars can be slotted into position prior to the attachment 
of the final end of the van body. 
 

Roof 

Total preparation 
and assembly time 
about 5 minutes. 
Allow sufficient 
time for the 
adhesive to dry 
thoroughly 

 
 
 
Attach the 3D printed roof to the body, taking care to centralise it with the body. 

Отзывы: