DETAIL 1
DETAIL 3
DETAIL 2
11 /20
Wa
rnin
g la
bel
4
C
A
K
K
F
Attach the UPPER SLATS (K) to the UPPER SAFETY RAILS (G). Lock the SLATS (K) in-place with 44 PLASTIC PLUGS (Y), as
shown in detail (1).
Attach the SLAT SPACERS (Q) between SLATS (K) as shown in details (2 & 3)
B34313709605
Q
K
K
G
Y
K
K
K
K
Q
Q
K