background image

 

molbloc, molbloc-S, molbox, molstic and molstic-s are trademarks, registered and otherwise, of 

DH Instruments, Inc. 

VCR is a registered trademark of the Swagelok Company.

 

Document 560065 

030425 

DH Instruments, Inc. 

4765 East Beautiful Lane 

Phoenix  AZ  85044-5318 

USA 

 

 

Tel 602.431.9100

Fax 602.431.9559

[email protected]

www.dhinstruments.com

 

SYSTEM PRESSURIZATION AND 

REGULATOR ADJUSTMENT 

 

 

During system operation, be extremely careful 
not to apply pressure in excess of the maximum 
operating pressure of the molbox: 600 kPaa  
(87 psia) for molbox1-A700K; 250 kPaa (36 psia) 
for molbox1-A350K.

 

 

Once the test system with molbloc-S and molstic-S has been 
completely interconnected, the following procedure should 
be used for its safe pressurization and operation. 

The outlet pressure of a pressure reducing regulator is 
controlled by adjusting the position of the control knob.  
Rotating the knob in the clockwise direction raises the outlet 
(control) pressure.  Counterclockwise rotation, coupled with 
venting of the downstream side of the regulator plumbing, 
lowers the outlet pressure.  molstic-S regulators are NOT 
self-venting so the outlet pressure will not decrease with 
counterclockwise rotation of the control knob unless the 
downstream gas is allowed to escape. 

Make final adjustments of control pressure in the direction of 
increasing pressure in order to obtain the most accurate and 
stable set point. 

System Pressurization 

 

Set inlet pressure to minimum:  

Turn the regulator’s 

adjustment knob counterclockwise until the spring force 
has been relieved, and if so equipped close the shut-off 
directly downstream of the pressure control regulator. 

 

Open molstic-S flow control/shut off valve(s): 

 

Valves must be open to allow test gas to fill the test 
system. 

 

Plug-off/cap-off system:  

Place a cap or plug 

 

(as applicable) on the outlet fitting of the test system.   

 

Isolate from vacuum system: 

 If the outlet plumbing of 

the molstic-S flows into a vacuum pump, disconnect or 
otherwise isolate from the vacuum system.  When capping 
off ISO-KF style flanges use overpressure rings to 
insure a leak free connection at positive line pressure. 

 

Open DUTs flow control valve:

  If the test system 

contains a DUT that has flow control capability, it must 
be slightly opened in order to allow pressure to pass 
through.  All that is necessary is a small flow to allow the 
system to fully pressurize. 

 

Display system pressure:  

Monitor the system 

pressure as measured by molbox by pressing the [P&T] 
function until the pressure is displayed.  Refer to molbox 
Operation and Maintenance Manual for details. 

 

Turn on gas supply:

  Apply the supply pressure to the 

pressure control regulator. 

 

Slowly raise system pressure to desired test 
pressure: 

Rotating the regulator’s control knob 

clockwise raises the outlet pressure. Rotate 
counterclockwise to lower the outlet pressure.  Increase 
the system pressure to the desired DUT operating 
pressure. Make final adjustments of control pressure in 
the direction of increasing pressure in order to obtain the 
most accurate and stable set point. 

Adjust the regulator to obtain the desired operating 

pressure.

  Provide additional margin only if the final pressure 

will be within the safe operating range of the molbox. 

Regulator Adjustment 

Once the regulator has been adjusted to the desired 
pressure its adjusting stem should be locked down to 
prevent further adjustments.  This will help protect the 
molbox RPTs from over-pressurization. 

 

Remove regulator knob cover:

  Use a small flat 

screwdriver to remove the plastic cap on the top of the 
regulator adjustment knob.

 

 

Loosen jamb nut:

  Using the properly sized socket 

wrench, loosen the jamb nut located on top of the 
adjustment knob.

 

 

 

Adjust knob position:  

Rotate the regulator adjustment 

knob clockwise until it gently bottoms out against the 
regulator body.

 

 

Tighten jamb nut:

  Hold the adjustment knob in 

position while using the socket wrench to tighten the 
jamb nut against the top of the adjustment knob.

 

 

Retest system pressure:

  Vent the system pressure.  

Repeat system pressurization procedure to verify the 
regulator pressure setting.  Readjust if necessary.

 

 

Replace regulator knob cover:

  Place the regulator 

adjustment knob cover back on top of the knob and 
gently snap back in place. 

The following parts are included in the shipment: 

DESCRIPTION 

QTY 

PART NO. 

Regulator, pressure reducing 

103232 

Regulator bracket 

123657 

Adaptor, 8VCR x 8T 

103233 

Male nut, 8VCR 

103029 

Gasket, 8VCR 

102923 

Quick connect body 

103234 

Quick connect stem 

103235 

Union, 8VCR male 

103236 

SHC screw, #10-32 x 3/8 

103277-Z 

Split lock washer, #10 

103021-Z 

Flat washer, #10 

103278-Z 

SHC screw, M4 x 12 

101016-Z 

Flat washer, M4 

100918-Z 

Nut plate, 60 mm 

123621 

 

Отзывы: