background image

DGS - 17 Lucienne Ave. Danielson, CT 06239 - 800-932-3339 - [email protected] 

Please visit gymsupply.com for product assembly videos.

BACK

SIDE VIEW

Cut at middle

1-1/4” Deck Screws

x2

x2

Secure pulleys to top of salmon ladder using 1-1/4” deck screws, to 

the top of the salmon ladder, being sure that the longer side of the 

pulley arm faces the side of the ladder with peg holes.

Secure pads to back side of salmon ladder using 1-1/4” deck screws, 

being sure to leave a 2” space between the pad and upright for the 

weights and rope to slide behind.

Unwrap rope and pull taught. Measure to the center of the rope 

and cut in the middle, leaving one length of rope extending from 

each side of the bar.

Thread cut end of rope over  pulley on long side first, then short 

side, so that the rope hangs down towards the pad on the back of 

the salmon ladder upright.

Tie weights on to end of each side. Start with two weights and 

adjust if needed with more or less depending on desired bar 

action after release. Test bar and weight action before cutting 

ropes down to desired lengths.

Weights should slide freely behind pads on back of salmon 

ladder uprights.

Weights

Weights

SALMON LADDER PULLEY SYSTEM

SIDE VIEW

1-1/4”

Deck

Screws

SALMON LADDER BAR

Содержание Real Life Ninja Starter Pack 1

Страница 1: ...26 Pegs 4 3 8 x 4 Carriage Bolts with Flat and Lock Washers 1 Bar 2 Pulley Rigs for Top of uprights with 20 1 drywall screws for mounting to top of uprights 2 Weights with rope 2 Post Pads with 16 2...

Страница 2: ...r Socket 9 16 Socket Adjustable Wrench Phillips Head Screw Driver Drill with Hammer setting 3 8 Wedge Bit Impact Driver Hammer 3 16 Allen Key DGS 17 Lucienne Ave Danielson CT 06239 800 932 3339 info g...

Страница 3: ...DGS 17 Lucienne Ave Danielson CT 06239 800 932 3339 info gymsupply com Please visit gymsupply com for product assembly videos...

Страница 4: ...e front surface of the wall is flush Any overhang should be on the higher section so someone sliding down the face would not catch on it Middle Bottom Middle Bottom Middle Bottom Reinstall previously...

Страница 5: ...dust and debris from the hole Step 3 Select a powered impact wrench that does not exceed 245 ft lbs maximum torque Tscrew for the selected anchor diameter Attach an appropriate sized hex socket drive...

Страница 6: ...els to back of warped wall using 2 Deck Screws into pre drilled holes Be sure the panel with pre installed mounting block is installed with the block closest to the top and that top edge of panel is f...

Страница 7: ...t Pegboard into place and secure on Salmon Ladder end Secure on warped wall end using supplied bolts through spacer block into pre installed inserts in side of warped wall 16 17 Check to make sure mon...

Страница 8: ...and rope to slide behind Unwrap rope and pull taught Measure to the center of the rope and cut in the middle leaving one length of rope extending from each side of the bar Thread cut end of rope over...

Отзывы: