13

Troubleshooting

         
     

    

  

 

        
           
    
     
       

 

            
            
              
 
             
         

 

           
         
  

Qualified

 

personnel

 

can

 

use

 

the

 

following

 

troubleshooting

 

steps

 

if

 

the

PV

 

system

 

does

 

not

 

operate

 

correctly:

Status

 

Indications

 

and

 

Error

 

Reporting

Start

 

up

 

LED

One

 

minute after DC power is first applied to the microinverter,one short red

 

blinks indicate a successful microinverter startup sequence,be equal or greater

 

than two short red blinks after DC power is first applied to the microinverter

 

indicate a failure during microinverter setup.

Operation

 

LED

Flashing

 

Slow

 

Blue

  

-

 

Producing

 

small

 

power

Flashing

 

Fast

 

Blue

 

-

 

Producing

 

big

 

power

 

Flashing

 

Red

 

-

 

Not

 

producing

 

power

                          Red blinking two times-AC low-voltage or high-voltage
                          Red blinking three times-Grid Malfunction
                     

GFDI

 

Error

A

 

four

 time

 

red

 

LED

 

indicates

 

the

 

Microinverter

 

has

 

detected

 

a

 

Ground

 

Fault

 

 

Detector

 

Interrupter

 

(GFDI)

 

error

 

in

 

the

 

PV

 

system.

 

Unless

 

the

 

GFDI

 

error

 

 

has

 

been

 

cleared,

 

the

 

LED

 

will

 

remain

 

four

 times blinking.

Other

 

Faults

All

 

other

 

faults

 

are

 

reported

 

to

 

the

 

ECD.

 

Refer

 

to

 

the

 

ECD

 

Installation

 

and

 

Operation

 

Manual

 

for

 

a

 

list

 

of

 

additional

 

faultsand

 

troubleshooting

 

procedures.

WARNING:

Only qualified personnel should directly handle the

APsystems microinverter.

WARNING:

Never disconnect the DC wire connectors under

load. Ensure that no current is flowing in the DC wires prior to

disconnecting. An opaque covering may be used to cover the

module prior to disconnecting the module.

WARNING:

Always disconnect AC power before disconnecting

the PV module wires from the APsystems microinverter. Either

disconnecting by the appropriate AC circuit breaker or unplugging

the first AC connector of the first Microinverter in a branch circuit

is suitable as a means of disconnection.

WARNING:

The APsystems microinverter is powered by PV module

DC power. AFTER disconnecting the DC power, when reconnecting

the PV modules tothe Microinverter, be sure to watch for the three
short LED flashes.

Содержание SUN1300G

Страница 1: ...Installation User Manual Rev 1 3 All Rights Reserved Model SUN600G SUN1300G Photovoltaic Grid connected Microinverter ...

Страница 2: ...circuit junction box 9 Step 2 Attach the Microinverters to the racking or the PV module frame 9 Stpe 3 Connect the microinverters in parallel 10 Step 4 Install a AC protective end cap at the end of AC cable 11 Step 5 Connect Microinverters to the PV Modules 11 Microinverter system operating instructions 12 Troubleshooting 12 Status Indications and Error Reporting 13 Start up LED 14 Operation LED 1...

Страница 3: ...ce the Microinverters Perform all electrical installations in accordance with local electrical codes Before installing or using the Microinverter please read all instructions and cautionary markings in the technical documents and on the Microinverter system and the solar array Be aware that the body of the Microinverter is the heat sink and can reach a temperature of 80 C To reduce risk of burns d...

Страница 4: ... TV technical for help Changes or modifications not expressly approved by the party responsible for compliance may void the user s authority to operate the equipment Communication Statement The systems Energy Monitoring and Analysis EMA software analyzes and reports the performance of each module from real time data collected through the Energy Collect Device ECD gateway The EMA promptly detects a...

Страница 5: ...rning the decommissioning of equipment CE mark is attached to the solar inverter to verify that the unit follows the provisions of the European Low Voltage and EMC Directives Refer to the operating instructions Qualified personnel Person adequately advised or supervised by an electrically skilled person to enable him or her to perceive risks and to avoid hazards which electricity can create For th...

Страница 6: ... System Introduction The Microinverter is used in utility interactive grid tied applications comprised of three key elements Microinverter Energy Collect Device ECD RTU Energy Monitor and Analysis EMA web based monitoring and analysis system ...

Страница 7: ... failure exists across the PV system Microinverters are designe d to operate at full power at ambient outdoor temperayures of up to 149 F 65 C The inverter housing is designed for outdoor installation and complies with the IP65 environmental enclosure rating Simple to install You can install individual PV modules in any combination of Module quantity orientation different type and power rate The G...

Страница 8: ...hase grid to achieve three phase grid and operate with most 60and 72 cell PV modules For more information please see the Technical Data page p 18 of this manual Model Number AC grid PV Module Max Per branch Module Connector SUN600G 50 60Hz 127 240V 60 72 Cell 8 for 25A breaker MC 4 Type or Customize SUN1300G 50 60Hz 240V 60 72 Cell 4 for 25A breaker MC 4 Type or Customize ...

Страница 9: ...s WARNING Be aware that only qualified professionals should install and or replace Microinverters WARNING Before installing or using anMicroinverter please read all instructions and warnings in the technical documents and on the Microinverter system itself as well as on the PV array WARNING Be aware that installation of this equipment includes the risk of electric shock WARNING Do not touch any li...

Страница 10: ...ch circuit junction box to the point of utility Interconnection WARNING Wiring colour code can be different according local regulation check all the wires of the installation before connecting to the AC cableto be sure they match Wrong cabling can damage irreparably the microinverters such an issue is not covered by the warranty Step 2 Attach the Microinverters to the racking or the PV module fram...

Страница 11: ...m of 3 4 1 5cm between the roof and the bottom of the Microinverter to allow proper air flow Stpe 3 Connect themicroinverters in parallel a Check the Microinverter technical data page p 18 for the maximum allowable number of Microinverters on each AC branch circuit b Plug the male AC connector of the Microinverter into the female connector to get it connected AC connector interface as follows WARN...

Страница 12: ...s will happen as soon as the cables are plugged in and will show that the Microinverter is functioning correctly This entire check function will start and end within 5 seconds of plugging in the unit so pay careful attention to these lights when connecting the DC cables WARNING Double check to make sure all of the AC and DC wiring has been correctly installed Ensure that none of the AC and or DC w...

Страница 13: ...ore power generated 4 Plug in the ECD and follow the instructions according to the manual for the ECD 5 The Microinverters will start to send performance data over power line to the ECD The time required for all the Microinverters in the system to report to the ECD will vary with the number of Microinverters in the system You can verify proper operation of the Microinverters via the ECD See the EC...

Страница 14: ...em Unless the GFDI error has been cleared the LED will remain four times blinking Other Faults All other faults are reported to the ECD Refer to the ECD Installation and Operation Manual for a list of additional faultsand troubleshooting procedures WARNING Only qualified personnel should directly handle the APsystems microinverter WARNING Never disconnect the DC wire connectors under load Ensure t...

Страница 15: ... data displays from other units most likely a Microinverter problem To troubleshoot a non operating Microinverter Follow the steps below in order 1 Verify the utility voltage and frequency are within ranges shown in the Technical Data section of this manual 2 Check the connection to the utility grid Verify utility power is present at the inverter in question by removing AC then DC power Never disc...

Страница 16: ...rter 3 Cover the module with an opaque cover 4 Disconnect the PV module DC wire connectors from the Microinverter 5 Remove the Microinverter from the PV array racking B Remove the opaque cover Install a replacement Microinverter to the rack Remember to observe the flashing LED light as soon as the new Microinverter is plugged into the DC cables C Connect the AC cable of the replacement Microinvert...

Страница 17: ...with those of the Microinverter Please refer to the datasheet or user manual WARNING You must match the DC operating voltage range of the PV module with the allowable input voltage range of the Microinverter WARNING The maximum open circuit voltage of the PV module must not exceed the specified maximum input voltage of the inverter ...

Страница 18: ...uency Range 50Hz 45 55 60Hz 59 3 60 5 Extended Reconnect Output Frequency Range Power Factor 0 99 Total Harmonic Distortion 3 Efficiency Max Inverter Efficiency 96 5 Night Power Consumption 50mW Mechanical Data Operating Ambient Temperature Range 40 C to 65 C Storage Temperature Range 40 C to 85 C Dimensions W x H x D 187mm X 163mm X 29mm Weight 2 2kg Communication Powerline Enclosure Rating IP65 ...

Страница 19: ...nge 50Hz 45 55 60Hz 59 3 60 5 Extended Reconnect Output Frequency Range Power Factor 0 99 Total Harmonic Distortion 3 Efficiency Max Inverter Efficiency 96 5 Night Power Consumption 50mW Mechanical Data Operating Ambient Temperature Range 40 C to 65 C Storage Temperature Range 40 C to 85 C Dimensions W x H x D 450mm X 455mm X 35mm Weight 6 5kg Communication Powerline Enclosure Rating IP65 Cooling ...

Страница 20: ...ABLE TO BROADBAND ROUTERECDMAX 8 SUN600G2726S BOXGROUNDmeter Installation User Manual 19 Wiring Diagram Sample Wiring Diagram Three Phase MAX 9 SUN600G meter ECD GROUND ETHERNET CABLE TO BROADBAND ROUTER JUNCTION BOX BLACK L2 RED L1 YELLOW NEUTRAL Sample Wiring Diagram SUN600G Sunshine Sunshine Sunshine MAX 9 SUN600G Sunshine Sunshine Sunshine MAX 9 SUN600G Sunshine Sunshine Sunshine 26 RTU ...

Страница 21: ...CTION BOX Sample Wiring Diagram SUN600G MAX 8 SUN600G ECD ETHERNET CABLE TO BROADBAND ROUTER BLACK L2 RED L1 YELLOW NEUTRAL MAX 8 SUN600G MA 8 SUN600G Installation User Manual 20 RTU Sample Wiring Diagram Single Phase ...

Страница 22: ...er ECD GROUND ETHERNET CABLE TO BROADBAND ROUTER JUNCTION BOX BLACK L2 RED L1 YELLOW NEUTRAL Sample Wiring Diagram SUN1300G MAX 4 SUN1300G MAX 4 SUN1300G Installation User Manual 21 RTU Sample Wiring Diagram Three Phase ...

Страница 23: ...er ECD GROUND ETHERNET CABLE TO BROADBAND ROUTER JUNCTION BOX BLACK L2 RED L1 YELLOW NEUTRAL Sample Wiring Diagram SUN1300G MAX 4 SUN1300G MAX 4 SUN1300G Installation User Manual 22 RTU Sample Wiring Diagram Single Phase ...

Отзывы: