Dextra HBE3 M3 LE3 Скачать руководство пользователя страница 3

 

HBE3 M3 LE3/LS3 Installation Leaflet 

DIL-0300-0068 

Revision - B 

 

25/04/2022 

3.

 

 

 
 
 
 
 
 
 
 
 

Drill two holes and secure the side bracket with two 

screws. 

4.

 

 

 
 
 
 
 
 
 
 

Pass the cable through and wire directly into the 

terminal block. Secure the mains cable using the 

internal cable clamp. 

5.

 

 

 
 

 

 
 
 
 
 
 

Connect the battery. 

6.

 

 

 
 
 

 

 
 
 
 
 

Attach the top cover to the side bracket and secure 

the fitting in place. 

1.

 

Recessed 

 
 
 

 
 
 
 

 

Make a cut-out in the ceiling using the dimensions 

pictured. 

2.

 

 

 
 
 
 
 
 
 
 

Remove the top cover and drill the cable entry hole in 

the indicated location. 

3.

 

 

 
 
 
 
 
 
 
 
 

Pass the cable through, and install the recessed 

bracket. 

4.

 

 

 
 
 

 

 
 
 
 
 

Pass the cable through and wire directly into the 

terminal block. Secure the mains cable using the 

internal cable clamp. 

Содержание HBE3 M3 LE3

Страница 1: ...operational with the cover removed NOTE INSTALLATION AND OPERATION OF THE LUMINAIRE BEYOND ITS SCOPE OF SUPPLY WILL INVALIDATE THE WARRANTY 1 Ceiling Wall surface mount Drill a hole in the ceiling and feed the cable through 2 Remove the top cover and drill the cable entry hole in the indicated location 3 Drill two fixing holes and secure the cover in place with two screws 4 Pass the cable through ...

Страница 2: ...ll two fixing holes and secure the bracket in place with two screws 4 Pass the cable through and wire directly into the terminal block Secure the mains cable using the internal cable clamp 5 Connect the battery 6 Attach the top cover to the suspended bracket and secure the fitting in place 1 Side mounted Drill a hole in the ceiling and feed the cable through 2 Remove the top cover and drill the ca...

Страница 3: ...nal cable clamp 5 Connect the battery 6 Attach the top cover to the side bracket and secure the fitting in place 1 Recessed Make a cut out in the ceiling using the dimensions pictured 2 Remove the top cover and drill the cable entry hole in the indicated location 3 Pass the cable through and install the recessed bracket 4 Pass the cable through and wire directly into the terminal block Secure the ...

Страница 4: ...attery failure Red indicator once every 3 seconds Lighting source failure Red indicator twice every 3 seconds Less than rated duration time Red indicator three times every 3 seconds 8 Self Test LS3 only Every month the luminaire will undergo an automatic test which lasts for 10 minutes An annual duration test will also occur for a total of 3 hours The luminaire will return to normal operation once...

Отзывы: