13
ENG
5)
Mark the holes for fastening
the structure to the wall (two on
the right and two on the left).
6)
Remove the structure and
drill the 4 holes as marked.
4)
Lean the structure you have just assembled against the wall.
Use a level to check that the structure is positioned correctly in
both a parallel and perpendicular position to the wall.
It is also advisable to check that both legs are the same distance from the wall.
Содержание Westminster Console WEST
Страница 4: ...5 PACKING LIST LAVABO I T A E Lavabo Westminster semincasso x1 E ...
Страница 10: ...11 PACKING LIST BASIN E N G E Westminster semi inset basin x1 E ...
Страница 16: ...17 PACKING LIST WASCHBECKEN D E U E Halbeinbau Waschbecken Westminster x1 E ...
Страница 22: ...23 LISTE DES ACCESSOIRES LAVABO F R A E Lavabo Westminster semi encastré x1 E ...
Страница 28: ...29 LISTA DE CONTENIDO LAVABO E S P E Lavabo Westminster semiempotrado x1 E ...
Страница 34: ...35 УПАКОВОЧНЫЙ ЛИСТ РАКОВИНА P Y C E Раковина Westminster полувстроенная x1 E ...