17
11)
At this point, you can remove the basin and drill the holes
marked on the wall.
Fit the basin support brackets and fasten them with screws and
rawlplugs not supplied.
9)
Rest the basin (G) on the
supports fitted on the structure,
holding it at the rear.
10)
Keeping the basin in the correct
position with the aid of the level,
mark the position of the holes for
fastening the basin support S-shaped
brackets.
F
ENG
Содержание New Etoile
Страница 1: ......
Страница 42: ...Devon Devon A B C D E Devon Devon Devon Devon 43 21 22 23 24 25 26 7 8 1 2 3 4 5 6 7 8 A B C D E P Y C...
Страница 43: ...A x1 B x2 C x2 D x2 E x2 F x8 44 A B F C D E x8...
Страница 44: ...45 E New Etoile x1 F S 2 Devon Devon G H P Y C...
Страница 45: ...46 2 1...
Страница 46: ...47 3 4 D 5 P Y C...
Страница 47: ...48 6 7 8 8...
Страница 48: ...49 11 9 10 S F P Y C...
Страница 49: ...50 14 12 13...