![Devico DeviFlex Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/devico/deviflex/deviflex_manual_2488819005.webp)
10) Add a new drill rod and do the first “Mark” on the PDA.
11) Perform the survey by adding new drill rods
without rotating
the drill string. Mark the top and bottom
of the drill rods to ensure no rotational movement occur as the drill string is lowered down.
12) Survey until the drill bit reaches hole bottom. Pull out drill rods to retrieve the DeviFlex and download
data.
13) Transfer the results from both surveys as hole index 1 and 2 in a DeviSoft project. (If the surveys were
performed in seperate projects, save the files and use the “File “- “Import from other projects” function).
14) Let the oriented run be the active index and open the “Edit” window.
Содержание DeviFlex
Страница 7: ...459095 Expanding Orientation Unit DF...