ElectroVap RTH-V2
49
Pictures and values are not contractual - The devices may be subject to changes without notice
M1: CHECKING 50hr
DUE
M2: MAINTENANCE
DUE
This message is displayed 50 hours after the first
start-up.
It is then necessary to check the tightness of the
electrical and hydraulic connections (steam pipe, drain
circuit, water supply, etc.). The device is not stopped.
The maintenance timer has arrived at 0, it is necessary to
maintain the device. The device is not stopped.
5.5 MAINTENANCE ALERTS
COOLING CYCLE
IN PROCESS
MAINTENANCE
DUE
MANUAL DRAIN IN
PROCESS
ou
ou
This message is displayed once after pressing the manual
drain button. The drain is activated.
This means that the manual drain is complete and you
have to wait for the tank temperature to go down before
servicing.
The tank is empty and cooled, maintenance can be done.
See technical manual.
or
or
M3: SERVICE OVER
DUE: COOLING
M3: SERVICE OVER
DUE: STOP UNIT
M3: SERVICE OVER
DUE: DRAINING
ou
ou
The message M3 is displayed when the M2 display
is displayed and 100 hours have elapsed without
maintenance.
Then the unit is shut down, drained, the tank cooled, and
put on hold of mandatory maintenance.