background image

Содержание AMT400B34-SM1 PMA

Страница 1: ...FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE MODELS AMT400B34 SM1 PMA OLR350H28B c us Attention Do not tamper with the unit or its controls Call a quali...

Страница 2: ...TALLATION OF ACCESSORIES 7 2 10 1 Air Conditioner or Heat Pump 7 OPERATION 8 3 1 START UP 8 3 2 SEQUENCE OF OPERA TIONBE KETTAFG RIELLO 40 F 8 3 3 CHECKS AND ADJUSTMENTS 8 3 3 1 Pm qing the oil line 8...

Страница 3: ...IALS CANADA TABLE 6 MINIMUM CLEARANCES COMBUSTIBLE MATERIALS USA TABLE 7 PARTS LIST FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 FIGURE 5 FURNACE DIMENSIONS FIGURE 6 LADDER DIAGRAM HEATING AND COOLING FIGURE 7...

Страница 4: ...the furnace Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform to local codes or in the absence of same to codes of the...

Страница 5: ...the connections are direct and kept to a minimum The heater should also be located close to the centre of the air distribution system 2 2 ELECTRICAL SYSTEM CAUTION The exterior of the unit must have...

Страница 6: ...thermal switch will shut down the oil burner The device will then need to be re armed MANUALLY Refer to the detailed instructions and wiring diagrams supplied with the BVSO for the installation and w...

Страница 7: ...9 m 16 an auxiliary pump Follow the pump instructions to determine the size of pipe needed in relation to the rise or to the horizontal distance 2 8 DUCTING Poisonous carbon monoxide gas hazard DO NO...

Страница 8: ...erature To start the unit turn the main electrical switch on 3 2 SEQUENCE OF OPERATION BECKETT AFG RIELLO 40 F 1 Normally open contact T T on primary relay closed when thermostat calls for heat 2 Beck...

Страница 9: ...luded with the damper After the furnace has been firing for at least five minutes the draft regulator should be set to between 0 025 and 0 060 W C 3 3 5 OVERFIRE PRESSURE TEST The overfire draft that...

Страница 10: ...ds the temperature specified in Table 1 p 13 change to the next lower or higher blower speed tap until the temperature rise falls to the target If the excessive temperature rise cannot be increased or...

Страница 11: ...e unit the heat exchanger and combustion chamber should be inspected to determine if replacement is required 9 After the cleaning replace the heat exchanger baffles flue collar plate and oil burner 10...

Страница 12: ...y applying pressure to it in the centre between the pulleys The belt displacement should be about 25 4 mm 1 refer to Figure 4 1 Adjust the belt by using the two adjustment screws located near the moto...

Страница 13: ...Dealer name and address Serial number Night START UP RESULTS Nozzle Burner adjustments CO2 Gross stack temperature Ambient temperature Chimney draft Overfire draft Test performed by Primary air Fine...

Страница 14: ...mp pressure PSIG 135 135 155 125 Volts Hertz Phase Blower 230 60 1 Volts Hertz Phase Burner 115 60 1 Ope rating voltage range 14 6 Minimum ampacity for wirin_t sizin_t 17 4 Max fuse size CAmps 20 0 BE...

Страница 15: ...mm 9 0 6 m 24 0 15 m 6 0 15m 6 0 0 25 mm 9 0 25 mm 9 0 6 m 24 Refer to the applicable installation code if a clearance reduction is required ex CSA B139 in Canada 0 9 m 36 Table 6 Minimum clearances c...

Страница 16: ...Figure 5 Furnace dimensions T 9i _ rT rT NS 1229 _e A 16...

Страница 17: ...L RF AS 8AO_A OU FQUIVAi FNi OJk_ C VATiSA ON Si i E vlENi J J Fx F _ 24 vAC SWiiCIIING IRELi_Y R S _ _ _ _k _JN 24 v ACi FA _ 7 VENTLATEU_ LbTATE R i ii i J I FRo DISPOSIFIF D ARR F ANII REFOULEMEX...

Страница 18: ...NEI _ OR tE ONES Sl i i E Obi JU O R Y _2 c j BRi NC EM N N NE u B RUL U_ cc I REFE_4ER ALX DAOR _bk E c ELECTRQL E o r I FOURNIS Av EC E BRUL t_ Ot StIR LE zi c I REIis S E COMBUS C zi _ ACTOR v WIRI...

Страница 19: ...n t_FAI _ _NCl Tr IT I_ASf_ WS SUPPLED W T E BUI NER OR HE ONES ON TH CO dBUS ON RELAY BRANC MEN NERN DU BRLJ dR REFERER AUX DAQRAMMES FLECTRQ E O iNIS AVEC L BRU EUi OU SOR L REIAS E COMB SION F _CT...

Страница 20: ...COMPONENTS AND REPLA CEMEN T PAR TS 20...

Страница 21: ...Figure 9 Parts List With 4 speed motor PSC o BS0043B 21...

Страница 22: ...assembly rear side Insulation front panel Baffle right lateral Panel assembly front side Corner conduit Electrical box Fan Limit 11 1 2 Contactor 240 VAC Electrical box cover Observation door assembl...

Страница 23: ...FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE MODELS AMT400B34 SM1 PMA OLR350H28B c us Attention Do not tamper with the unit or its controls Call a quali...

Страница 24: ...TALLATION OF ACCESSORIES 7 2 10 1 Air Conditioner or Heat Pump 7 OPERATION 8 3 1 START UP 8 3 2 SEQUENCE OF OPERA TIONBE KETTAFG RIELLO 40 F 8 3 3 CHECKS AND ADJUSTMENTS 8 3 3 1 Pm qing the oil line 8...

Страница 25: ...IALS CANADA TABLE 6 MINIMUM CLEARANCES COMBUSTIBLE MATERIALS USA TABLE 7 PARTS LIST FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 FIGURE 5 FURNACE DIMENSIONS FIGURE 6 LADDER DIAGRAM HEATING AND COOLING FIGURE 7...

Страница 26: ...the furnace Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform to local codes or in the absence of same to codes of the...

Страница 27: ...the connections are direct and kept to a minimum The heater should also be located close to the centre of the air distribution system 2 2 ELECTRICAL SYSTEM CAUTION The exterior of the unit must have...

Страница 28: ...thermal switch will shut down the oil burner The device will then need to be re armed MANUALLY Refer to the detailed instructions and wiring diagrams supplied with the BVSO for the installation and w...

Страница 29: ...9 m 16 an auxiliary pump Follow the pump instructions to determine the size of pipe needed in relation to the rise or to the horizontal distance 2 8 DUCTING Poisonous carbon monoxide gas hazard DO NO...

Страница 30: ...erature To start the unit turn the main electrical switch on 3 2 SEQUENCE OF OPERATION BECKETT AFG RIELLO 40 F 1 Normally open contact T T on primary relay closed when thermostat calls for heat 2 Beck...

Страница 31: ...luded with the damper After the furnace has been firing for at least five minutes the draft regulator should be set to between 0 025 and 0 060 W C 3 3 5 OVERFIRE PRESSURE TEST The overfire draft that...

Страница 32: ...ds the temperature specified in Table 1 p 13 change to the next lower or higher blower speed tap until the temperature rise falls to the target If the excessive temperature rise cannot be increased or...

Страница 33: ...e unit the heat exchanger and combustion chamber should be inspected to determine if replacement is required 9 After the cleaning replace the heat exchanger baffles flue collar plate and oil burner 10...

Страница 34: ...y applying pressure to it in the centre between the pulleys The belt displacement should be about 25 4 mm 1 refer to Figure 4 1 Adjust the belt by using the two adjustment screws located near the moto...

Страница 35: ...Dealer name and address Serial number Night START UP RESULTS Nozzle Burner adjustments CO2 Gross stack temperature Ambient temperature Chimney draft Overfire draft Test performed by Primary air Fine...

Страница 36: ...mp pressure PSIG 135 135 155 125 Volts Hertz Phase Blower 230 60 1 Volts Hertz Phase Burner 115 60 1 Ope rating voltage range 14 6 Minimum ampacity for wirin_t sizin_t 17 4 Max fuse size CAmps 20 0 BE...

Страница 37: ...mm 9 0 6 m 24 0 15 m 6 0 15m 6 0 0 25 mm 9 0 25 mm 9 0 6 m 24 Refer to the applicable installation code if a clearance reduction is required ex CSA B139 in Canada 0 9 m 36 Table 6 Minimum clearances c...

Страница 38: ...Figure 5 Furnace dimensions T 9i _ rT rT NS 1229 _e A 16...

Страница 39: ...L RF AS 8AO_A OU FQUIVAi FNi OJk_ C VATiSA ON Si i E vlENi J J Fx F _ 24 vAC SWiiCIIING IRELi_Y R S _ _ _ _k _JN 24 v ACi FA _ 7 VENTLATEU_ LbTATE R i ii i J I FRo DISPOSIFIF D ARR F ANII REFOULEMEX...

Страница 40: ...NEI _ OR tE ONES Sl i i E Obi JU O R Y _2 c j BRi NC EM N N NE u B RUL U_ cc I REFE_4ER ALX DAOR _bk E c ELECTRQL E o r I FOURNIS Av EC E BRUL t_ Ot StIR LE zi c I REIis S E COMBUS C zi _ ACTOR v WIRI...

Страница 41: ...n t_FAI _ _NCl Tr IT I_ASf_ WS SUPPLED W T E BUI NER OR HE ONES ON TH CO dBUS ON RELAY BRANC MEN NERN DU BRLJ dR REFERER AUX DAQRAMMES FLECTRQ E O iNIS AVEC L BRU EUi OU SOR L REIAS E COMB SION F _CT...

Страница 42: ...COMPONENTS AND REPLA CEMEN T PAR TS 20...

Страница 43: ...Figure 9 Parts List With 4 speed motor PSC o BS0043B 21...

Страница 44: ...assembly rear side Insulation front panel Baffle right lateral Panel assembly front side Corner conduit Electrical box Fan Limit 11 1 2 Contactor 240 VAC Electrical box cover Observation door assembl...

Страница 45: ...FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE MODELS AMT400B34 SM1 PMA OLR350H28B c us Attention Do not tamper with the unit or its controls Call a quali...

Страница 46: ...TALLATION OF ACCESSORIES 7 2 10 1 Air Conditioner or Heat Pump 7 OPERATION 8 3 1 START UP 8 3 2 SEQUENCE OF OPERA TIONBE KETTAFG RIELLO 40 F 8 3 3 CHECKS AND ADJUSTMENTS 8 3 3 1 Pm qing the oil line 8...

Страница 47: ...IALS CANADA TABLE 6 MINIMUM CLEARANCES COMBUSTIBLE MATERIALS USA TABLE 7 PARTS LIST FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 FIGURE 5 FURNACE DIMENSIONS FIGURE 6 LADDER DIAGRAM HEATING AND COOLING FIGURE 7...

Страница 48: ...the furnace Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform to local codes or in the absence of same to codes of the...

Страница 49: ...the connections are direct and kept to a minimum The heater should also be located close to the centre of the air distribution system 2 2 ELECTRICAL SYSTEM CAUTION The exterior of the unit must have...

Страница 50: ...thermal switch will shut down the oil burner The device will then need to be re armed MANUALLY Refer to the detailed instructions and wiring diagrams supplied with the BVSO for the installation and w...

Страница 51: ...9 m 16 an auxiliary pump Follow the pump instructions to determine the size of pipe needed in relation to the rise or to the horizontal distance 2 8 DUCTING Poisonous carbon monoxide gas hazard DO NO...

Страница 52: ...erature To start the unit turn the main electrical switch on 3 2 SEQUENCE OF OPERATION BECKETT AFG RIELLO 40 F 1 Normally open contact T T on primary relay closed when thermostat calls for heat 2 Beck...

Страница 53: ...luded with the damper After the furnace has been firing for at least five minutes the draft regulator should be set to between 0 025 and 0 060 W C 3 3 5 OVERFIRE PRESSURE TEST The overfire draft that...

Страница 54: ...ds the temperature specified in Table 1 p 13 change to the next lower or higher blower speed tap until the temperature rise falls to the target If the excessive temperature rise cannot be increased or...

Страница 55: ...e unit the heat exchanger and combustion chamber should be inspected to determine if replacement is required 9 After the cleaning replace the heat exchanger baffles flue collar plate and oil burner 10...

Страница 56: ...y applying pressure to it in the centre between the pulleys The belt displacement should be about 25 4 mm 1 refer to Figure 4 1 Adjust the belt by using the two adjustment screws located near the moto...

Страница 57: ...Dealer name and address Serial number Night START UP RESULTS Nozzle Burner adjustments CO2 Gross stack temperature Ambient temperature Chimney draft Overfire draft Test performed by Primary air Fine...

Страница 58: ...mp pressure PSIG 135 135 155 125 Volts Hertz Phase Blower 230 60 1 Volts Hertz Phase Burner 115 60 1 Ope rating voltage range 14 6 Minimum ampacity for wirin_t sizin_t 17 4 Max fuse size CAmps 20 0 BE...

Страница 59: ...mm 9 0 6 m 24 0 15 m 6 0 15m 6 0 0 25 mm 9 0 25 mm 9 0 6 m 24 Refer to the applicable installation code if a clearance reduction is required ex CSA B139 in Canada 0 9 m 36 Table 6 Minimum clearances c...

Страница 60: ...Figure 5 Furnace dimensions T 9i _ rT rT NS 1229 _e A 16...

Страница 61: ...L RF AS 8AO_A OU FQUIVAi FNi OJk_ C VATiSA ON Si i E vlENi J J Fx F _ 24 vAC SWiiCIIING IRELi_Y R S _ _ _ _k _JN 24 v ACi FA _ 7 VENTLATEU_ LbTATE R i ii i J I FRo DISPOSIFIF D ARR F ANII REFOULEMEX...

Страница 62: ...NEI _ OR tE ONES Sl i i E Obi JU O R Y _2 c j BRi NC EM N N NE u B RUL U_ cc I REFE_4ER ALX DAOR _bk E c ELECTRQL E o r I FOURNIS Av EC E BRUL t_ Ot StIR LE zi c I REIis S E COMBUS C zi _ ACTOR v WIRI...

Страница 63: ...n t_FAI _ _NCl Tr IT I_ASf_ WS SUPPLED W T E BUI NER OR HE ONES ON TH CO dBUS ON RELAY BRANC MEN NERN DU BRLJ dR REFERER AUX DAQRAMMES FLECTRQ E O iNIS AVEC L BRU EUi OU SOR L REIAS E COMB SION F _CT...

Страница 64: ...COMPONENTS AND REPLA CEMEN T PAR TS 20...

Страница 65: ...Figure 9 Parts List With 4 speed motor PSC o BS0043B 21...

Страница 66: ...assembly rear side Insulation front panel Baffle right lateral Panel assembly front side Corner conduit Electrical box Fan Limit 11 1 2 Contactor 240 VAC Electrical box cover Observation door assembl...

Страница 67: ...FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE MODELS AMT400B34 SM1 PMA OLR350H28B c us Attention Do not tamper with the unit or its controls Call a quali...

Страница 68: ...TALLATION OF ACCESSORIES 7 2 10 1 Air Conditioner or Heat Pump 7 OPERATION 8 3 1 START UP 8 3 2 SEQUENCE OF OPERA TIONBE KETTAFG RIELLO 40 F 8 3 3 CHECKS AND ADJUSTMENTS 8 3 3 1 Pm qing the oil line 8...

Страница 69: ...IALS CANADA TABLE 6 MINIMUM CLEARANCES COMBUSTIBLE MATERIALS USA TABLE 7 PARTS LIST FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 FIGURE 5 FURNACE DIMENSIONS FIGURE 6 LADDER DIAGRAM HEATING AND COOLING FIGURE 7...

Страница 70: ...the furnace Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform to local codes or in the absence of same to codes of the...

Страница 71: ...the connections are direct and kept to a minimum The heater should also be located close to the centre of the air distribution system 2 2 ELECTRICAL SYSTEM CAUTION The exterior of the unit must have...

Страница 72: ...thermal switch will shut down the oil burner The device will then need to be re armed MANUALLY Refer to the detailed instructions and wiring diagrams supplied with the BVSO for the installation and w...

Страница 73: ...9 m 16 an auxiliary pump Follow the pump instructions to determine the size of pipe needed in relation to the rise or to the horizontal distance 2 8 DUCTING Poisonous carbon monoxide gas hazard DO NO...

Страница 74: ...erature To start the unit turn the main electrical switch on 3 2 SEQUENCE OF OPERATION BECKETT AFG RIELLO 40 F 1 Normally open contact T T on primary relay closed when thermostat calls for heat 2 Beck...

Страница 75: ...luded with the damper After the furnace has been firing for at least five minutes the draft regulator should be set to between 0 025 and 0 060 W C 3 3 5 OVERFIRE PRESSURE TEST The overfire draft that...

Страница 76: ...ds the temperature specified in Table 1 p 13 change to the next lower or higher blower speed tap until the temperature rise falls to the target If the excessive temperature rise cannot be increased or...

Страница 77: ...e unit the heat exchanger and combustion chamber should be inspected to determine if replacement is required 9 After the cleaning replace the heat exchanger baffles flue collar plate and oil burner 10...

Страница 78: ...y applying pressure to it in the centre between the pulleys The belt displacement should be about 25 4 mm 1 refer to Figure 4 1 Adjust the belt by using the two adjustment screws located near the moto...

Страница 79: ...Dealer name and address Serial number Night START UP RESULTS Nozzle Burner adjustments CO2 Gross stack temperature Ambient temperature Chimney draft Overfire draft Test performed by Primary air Fine...

Страница 80: ...ump pressure PSIG 135 135 155 125 Volts Hertz Phase Blower 230 60 1 Volts Hertz Phase Burner 115 60 1 Ope rating voltage range 14 6 Minimum ampacity for wirin_t sizin_t 17 4 Max fuse size CAmps 20 0 B...

Страница 81: ...mm 9 0 6 m 24 0 15 m 6 0 15m 6 0 0 25 mm 9 0 25 mm 9 0 6 m 24 Refer to the applicable installation code if a clearance reduction is required ex CSA B139 in Canada 0 9 m 36 Table 6 Minimum clearances c...

Страница 82: ...Figure 5 Furnace dimensions T 9i _ rT rT NS 1229 _e A 16...

Страница 83: ...L RF AS 8AO_A OU FQUIVAi FNi OJk_ C VATiSA ON Si i E vlENi J J Fx F _ 24 vAC SWiiCIIING IRELi_Y R S _ _ _ _k _JN 24 v ACi FA _ 7 VENTLATEU_ LbTATE R i ii i J I FRo DISPOSIFIF D ARR F ANII REFOULEMEX...

Страница 84: ...NEI _ OR tE ONES Sl i i E Obi JU O R Y _2 c j BRi NC EM N N NE u B RUL U_ cc I REFE_4ER ALX DAOR _bk E c ELECTRQL E o r I FOURNIS Av EC E BRUL t_ Ot StIR LE zi c I REIis S E COMBUS C zi _ ACTOR v WIRI...

Страница 85: ...n t_FAI _ _NCl Tr IT I_ASf_ WS SUPPLED W T E BUI NER OR HE ONES ON TH CO dBUS ON RELAY BRANC MEN NERN DU BRLJ dR REFERER AUX DAQRAMMES FLECTRQ E O iNIS AVEC L BRU EUi OU SOR L REIAS E COMB SION F _CT...

Страница 86: ...COMPONENTS AND REPLA CEMEN T PAR TS 20...

Страница 87: ...Figure 9 Parts List With 4 speed motor PSC o BS0043B 21...

Страница 88: ...assembly rear side Insulation front panel Baffle right lateral Panel assembly front side Corner conduit Electrical box Fan Limit 11 1 2 Contactor 240 VAC Electrical box cover Observation door assembl...

Отзывы: