DESCO WEST
- 3651 Walnut Avenue, Chino, CA 91710 • (909) 627-8178
DESCO EAST
- One Colgate Way, Canton, MA 02021-1407 • (781) 821-8370 • Website:
TB-3061
Page 2 of 4
© 2019 DESCO INDUSTRIES INC
Employee Owned
Features and Components
A
B
C D
E F
FRONT VIEW
G H I
J
REAR VIEW
Figure 2. Body Voltage Monitor features and
components
A. Monitored Operator Jack:
The operator connects to the
monitor here.
B. Monitored Supervisor Jack:
The supervisor or second
operator connects to the monitor here.
C. Operator LED:
When the LED is illuminated green, the
operator is properly grounded. When the LED is illuminated
red and the alarm sounds, the operator is not properly
grounded.
D. Mat LED:
When the LED is illuminated green, the
worksurface mat is properly grounded. When the LED is
illuminated red and the alarm sounds, the worksurface mat is
not properly grounded.
E. Tool LED:
When the LED is illuminated green, the tool is
properly grounded. When the LED is illuminated red and the
alarm sounds, the tool is not properly grounded.
F. Supervisor LED:
When the LED is illuminated green, the
supervisor is properly grounded. When the LED is illuminated
red and the alarm sounds, the supervisor is not properly
grounded.
G. Monitored Mat Terminal:
Monitors a worksurface mat for
proper dissipative resistance and static charges. Connect the
white mat monitor cord here.
H. Monitored Tool Terminal:
Monitors a grounded metal
tool fixture. Connect the white tool monitor cord here.
I. Ground Terminal:
Common ground point for the monitor.
Connect the green and yellow monitor ground cord here.
J. Power Jack:
Connect the included 5VDC power adapter
here.
Installation
1. Remove the monitor from the carton and inspect for
damage.
NOTE:
All Body Voltage Monitors are packaged with a
wire shorting the tool terminal to the ground terminal.
This is to prevent the tool circuit from alarming when not
in use.
2. Determine the mounting location of the Body Voltage
Monitor. The front panel should be visible to the
operator. Use the included mounting bracket and #8 pan
head screws if desired.
Figure 3. Installing the Body Voltage Monitor
Worksurface
Mat Monitor
Cord
Monitor Ground
Cord
Tool Monitor Cord
Metal Tool
Fixture
1 megohm
resistor