-
19
-
For more information, visit www.desatech.com
BRICK INSTALLATION FOR MODEL (V)GM36H
The bricks are packaged in four separate boxes. These boxes are labeled by sections of the firebox.
Box #1 – Hearth Panel
Box #2 – Rear Panel
Box #3 – Left Panel
Box #4 – Right Panel
Install the bricks one section at a time starting with the hearth panel followed by the rear panel and then the left or right panel. It is
important to install the bricks in this sequence.
NOTE
: INSTALLATION OF BRICK SHOULD BE DONE AFTER THE
FIREPLACE IS PLACED IN A PERMANENT LOCATION
HL
HXX
HAAH
HVV
HAAH
HAAH
HAAH
HVV
HVV
HWW
HAAG
HAAF
HAAF
HAAF
HF
HJ
HF
HF
HF
HE
HAAG
FULL
FULL
FULL
HL
HL
HL
HL
HL
HL
HSS
HTT
HF
HJ
HAAC
HJ
HJ
HJ
HUU
FULL
FULL
FULL
FULL
FULL
FULL
HC
HD
HSS
HSS
RIGHT PANEL-36
REAR PANEL-36
HL
HL
HJ
HJ
HJ
HJ
HL
HC
HZZ
HJ
HF
HAAA
HYY
HYY
HYY
FULL
FULL
FULL
FULL
FULL
FULL
D1
428F
HRR
HAAD
HAAD
HF
HQQ
HJ
HJ
HPP
L
L
L
AB
HF
HF
HL
HL
HOO
HAAE
FULL
FULL
FULL
FULL
LEFT PANEL-36
AB
HL
BOTTOM HEARTH-36
HAAB OR HD
HD
HL
HAAB OR HD
FULL SIZE BRICKS ARE NOT STAMPED
Use bricks HAAB and HNN for optional gas installation