18.
Do not activate the unit before the installation is completed.
19.
Insert the fog refill as the last procedure and verify the anti-tampering function.
20. When the installation is finished, always test the system.
21.
Install unit avoiding any obstacles in front of it which can prevent the spreading of the fog.
22.
The tip of a stranded conductor should not be soft-soldered where the conductor is subjected to
contact pressure.
23.
The Density unit machine should not be exposed to water spray or dripping.
24.
Request to Density group or its distributors to take part in courses for installers to ensure the optimal
page 20/20
www.densityglobal.com | [email protected]
Version 1.1.4