background image

Rev. C, October 2020 

Pro-Tester Operator’s Manual                                                                                                                  Page iii 

 
 

Table of Contents 

 

1

 

SAFETY PRECAUTIONS…………………………………………………..PAGE 1

 

2

 

GENERAL SAFETY & MAINTENANCE INFORMATION…………….PAGE 2

 

2.1

  

Intended Use…………………………………………………………………...Page 2

 

2.2

  

Maintenance…………………………………………………………………...Page 2

 

3

 

GENERAL PRODUCT DATA……………………………………………...PAGE 3

 

4

 

SITE PREPARATION……………………………………………………….PAGE 4

 

5

 

UNPACKING & INSTALLATION INSTRUCTIONS……………………PAGE 4

 

5.1

  

Unpacking and Preparation……………………………………………………Page 5

 

5.2

  

Electrical Plug Connection……………………………………………………..Page 5

 

5.3

  

Control Panel…………………………………………………………………..Page 7

 

5.4

  

Loading Samples………………………………………………………………Page 9

 

5.5

  

Settings……………………………………………………………………….Page 10

 

5.6

  

Elongation Definition………………………………………………………...Page 10

 

6

 

FACTORY SERVICING…………………………………………………...PAGE 13

 

7

 

USER INTERFACE MENU TREE………………………………………..PAGE 13

 

8

 

SYSTEM WIRING DIAGRAM……………………………………………PAGE 14

 

9

 

PRO-TESTER

TM

 WARRANTY…………………………………………….PAGE 14

 

 

Содержание Pro-Tester Double-Pull

Страница 1: ...Pro Tester Double Pull Pro Tester Operator s Manual Model Number T 0100 A Revision C...

Страница 2: ...on retrieval system or otherwise without prior written permission of DEMTECH Services Inc Notice Patents have been granted and or patent applications are pending or are in the process of preparation o...

Страница 3: ...RAL PRODUCT DATA PAGE 3 4 SITE PREPARATION PAGE 4 5 UNPACKING INSTALLATION INSTRUCTIONS PAGE 4 5 1 Unpacking and Preparation Page 5 5 2 Electrical Plug Connection Page 5 5 3 Control Panel Page 7 5 4 L...

Страница 4: ...me while it is plugged in and the power is turned on Incorrect use of the product such as overheating of the material can present a fire and explosion hazard especially near combustible materials and...

Страница 5: ...mproper use or abuse may lead to hazardous conditions for the user or other personnel or cause damage to the tensiometer Always keep this manual with the Pro Tester TM at or near the location where th...

Страница 6: ...on operation combined with automatic return saves time The enclosed controller system is easy to maintain You can be assured the Pro Tester TM has been built using the highest quality materials availa...

Страница 7: ...iled unpacking and installation instructions provided in this manual 5 Unpacking Installation Instructions This section contains instructions for the unpacking placement and installation of the Pro Te...

Страница 8: ...injury and or damage to the system be sure to use adequate care when lifting removing or replacing the system into the shipping transport container e You may operate the system from within the shippi...

Страница 9: ...grip heads in left to find the home position then out right to calibrate travel speed After a short pause the grips will then move back in left and stop at the A or B grip separation position dependi...

Страница 10: ...Operator s Manual 5 3 Control Panel The User Interface Control Panel is the main operator interface device for operating the Pro Tester TM Each component of the Control Panel is identified below refer...

Страница 11: ...nd is used to change various settings during Menu Mode operation refer to Section 6 5 c Grip Start Position Toggle Switch A B This switch allows the user to select between one of two grip separation s...

Страница 12: ...ckwise open The sample is prepared by bending the ends to be clamped so they can be easily loaded into the grips Load the sample from the top of the grip until the sample rests against the stop tabs t...

Страница 13: ...ant to access Once located follow the tree back to the top level Next utilizing the user interface on the Pro Tester TM proceed back down through the menu structure using the drawing as a guide to acc...

Страница 14: ...s test d Gauge Length GL This is the base value used by the Pro Tester TM for determining elongation percentage It is the Grip Separation once the initial tension value has been reached minus the Weld...

Страница 15: ...Rev C October 2020 Pro Tester Operator s Manual Page 12 Figure 6A Figure 6B Figure 6C Figure 6...

Страница 16: ...ices Inc at DemTech Services Inc Ship to address 6414 Capitol Avenue Diamond Springs CA 95619 U S A 7 User Interface Menu Tree Refer to Page 15 for the Pro Tester TM Menu Tree drawing This drawing can...

Страница 17: ...Refer to Page 16 for the Pro Tester TM System Wire Diagram This drawing can be very helpful in identifying and or troubleshooting basic wiring or interconnection issues related to the Pro Tester TM 9...

Страница 18: ...Rev C October 2020 Page 15 Pro Tester Operator s Manual Figure 7 1 T 0100HP A M001...

Страница 19: ...Rev C October 2020 Pro Tester Operator s Manual Page 16 Figure 8 1...

Страница 20: ...subjected to abuse accident or other abnormal conditions IF ANY FAULT DEVELOPS THE FOLLOWING STEPS SHOULD BE TAKEN 1 Notify DEMTECH Services Inc by calling 1 888 324 9353 Overseas customers should con...

Отзывы: