
PREPARATION
a.
Connect
hose
to
water
inlet
connector
and
turn
on.
b.
Connect
high
pressure
hose
to
connector.
c.
Connect
lance
to
hose.
d.
Connect
plug
to
suitable
RCD
protected
supply
and
turn
on.
e.
Top
up
fuel
levels
and
check
oil
levels
in
pump
and
engine.
f.
If
chemical
is
to
be
used
place
filter
in
drum
of
chemical
and
open
valve.
If
not
make
sure
valve
is
closed.
OPERATION
TO
START
MACHINE
a.
Push
blue
switch
once
to
start
the
engine.
b.
Pull
trigger
until
operating
pressure
is
reached.
c.
Push
red
switch
once,
burner
will
then
operate.
d.
Burner
will
then
ignite
once
trigger
is
pulled.
OPERATION
TO
STOP
MACHINE
a.
Close
the
chemical
valve
if
opened.
b.
Switch
to
cold
by
pressing
red
button
once
and
run
the
machine
until
the
water
turns
cold.
c.
Switch
off
by
pressing
blue
button
once.
d.
Pull
trigger
to
release
excess
pressure
and
disconnect
from
machine.
e.
If
the
machine
is
to
be
stored,
drain
water
system
and
top
up
the
fuel
and
oil
levels.
IF
IN
DOUBT
ASK
‐
OUR
ADVICE
IS
FREE
Содержание Tempest 1
Страница 9: ......
Страница 10: ......
Страница 17: ......
Страница 19: ......
Страница 20: ......
Страница 21: ...HH0049 3 8 Ferrules R1A HH0053 Hose from Pump to Tap 1 2 L P Yellow Hose...
Страница 27: ......
Страница 31: ...Frost Stat Heater Coil all cabinets 240v Heater Coil Thermostat L N E KTW 12 3 13 1 2 3 4...
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ...2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Inner Boiler Details 37 38 10 9 1 25 2a...
Страница 36: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 46: ...Pump for Tempest 1 and Tempest 3...
Страница 48: ...For Tempest 1 and Tempest 3...
Страница 50: ...Pump for Tempest 4 RK 13 17 RK 15 20H RK21 15...
Страница 52: ......
Страница 54: ......