background image

13

6.9 

Electrical connection and operational start-up

The electrical connections are utilized on this solar inverter using the connector contacts which are 

attached to the casing. Under no circumstances should the device be opened!

Power

controller

Anti-

islanding 

protection

Communi-

cation

Operating- and system control

MPP- 

Tracker 

Booster 

Isolation 

DC-Bus 

Solar inverter

DC 

DC

DC

String A 

String B 

String C 

AC

Public 

grid

Содержание Solivia 2.5

Страница 1: ...Operation and installation manual 2 5...

Страница 2: ......

Страница 3: ...Electrical connection and operational start up 13 6 10 Setup settings 14 6 11 LED operation and fault display 15 7 Operating concept 16 7 1 The display 16 7 2 Navigation in the display 16 7 3 Main me...

Страница 4: ...points in the operating and installation manual Isolate the device from the grid and the PV modules before carrying out any work on it As a result of very high temperatures the device surface can beco...

Страница 5: ...rter converts direct current from the solar cells into alternating current This enables you to feed your self produced solar energy into the public grid Thanks to efficient MPP tracking maximum capaci...

Страница 6: ...device against excessive tem peratures in the interior of the solar inverter In case of high ambient temperatures the maximum transferable power is limited The solar inverter is controlled by microcon...

Страница 7: ...1 Connections for solar modules 2 DC disconnector 3 Grid connection 4 Interface connection RS485 EIA485 5 Display for status messages and keypad for operation 6 Light emitting diodes for operational s...

Страница 8: ...resonating bodies light construction walls etc Installation is possible both indoors and in protected outdoor areas An increased ambient temperature can reduce the efficiency of the PV system Noise g...

Страница 9: ...t so that the solar inverter can be easily attached to the wall After that the device should be bolted on securely Assembly instructions 1 Mount the mounting plate with appropriate screws max 6mm into...

Страница 10: ...d terminal If you wish to integrate more than one inverter into the installation please proceed as illustrated in the drawings in the appendix Please note the cable length and the cable cross section...

Страница 11: ...the grid in case of a fault The error message PV grounding fault or PV grounding fault will appear on the display If you need to connect the positive or negative pole of the PV system to meet require...

Страница 12: ...tage 150 VDC 200 VDC 250 VDC 300 VDC 350 VDC 400 VDC 450 VDC 2500 W 2700 W 2900 W 3100 W 3300 W 3500 W 3700 W 6 7 2 Output power over AC voltage 2500 W 2700 W 2900 W 3100 W 3300 W 3500 W 3700 W 190 VA...

Страница 13: ...2381 Minden www harting com Order designation 09 45 145 1510 Cable Manager Blue IP67 Push Pull Data Plug 09 45 145 1500 Cable Manager White IP67 Push Pull Data Plug 230 V House connection line RS485 E...

Страница 14: ...RS485 EIA485 5V Not used Not used 0R 0R 121R TX_A RX_B TERM GND Pin 7 Pin 6 5V Not used Not used 0R 0R 121R TX_A RX_B TERM GND Pin 6 Pin 5 100 150 Ohm 0 25W When several devices are connected in serie...

Страница 15: ...verter using the connector contacts which are attached to the casing Under no circumstances should the device be opened Power controller Anti islanding protection Communi cation Operating and system c...

Страница 16: ...lt display language for solar inverters leaving the Delta factory is set to English After connecting to correct DC voltage and running through self test you will be asked to specify the network ID and...

Страница 17: ...sked to insert the PIN code and to confirm it twice 5 After confirmation you will then be able to select the desired country Note These steps must be executed without interruption Otherwise you will s...

Страница 18: ...lighting Through pressing the ENTER key the display lighting is switched on again Key A ESC To switch from the menu items to the main menu and to exit each sub menu Key B and C For scrolling in the i...

Страница 19: ...n Down Down Down Down Up Up Up Up Up Up Down to 2 1 Up to 1 2 Submenu N Now Submenu D Day Submenu W Week Submenu M Month Submenu Y Year Submenu T Total Submenu S Setup ESC ESC ESC ESC ESC ESC ESC ENTE...

Страница 20: ...tons select the auto test menu The display shows for example L 262 V 0 1 S Start OVT test The first line shows the actual over voltage limit and detection time settings according to the stan dards Pre...

Страница 21: ...automatically after 1 minute if no is pressed The first line shows the actual low frequency limit and detection time settings according to the standards Since the protection is not sensitive to the f...

Страница 22: ...failed pressing ESC the display goes back to the main menu and the inverter is in error condition The display shows AUTOTEST FAILED If the actual status is failed it s possible to restart the auto te...

Страница 23: ...rent day of the week and date 7 3 3 Submenu D Day This menu item displays the daily values for the grid feed Main menu D Day statistic D Energy Value Wh D AC Revenue Value Euro D AC Power Max Value W...

Страница 24: ...Main menu M Month statistic M Energy Value kWh M AC Revenue Value Euro M Runtime Value h Down Down Up Up Down to 2 1 Up to 1 2 Submenu M Month ESC ESC ESC ENTER Display of the monthly energy gain Dis...

Страница 25: ...used for changing the presettings of the solar inverter Main menu S Setup S LCD Contrast 0 9 S LCD Backlight Auto On S Menu Mode Now Setup S LCD language S Cash per kWh Value Euro xx xx S ID Number 00...

Страница 26: ...ore detailed information on the country settings menu within the submenu S Setup Submenu Setup Country settings Name of country S Country settings Critical undervoltage x V x xx s S Country settings U...

Страница 27: ...reinitializing the solar inverter whenever an error message appears on the display To reset the device proceed as follows 1 Isolate the solar inverter from the grid open automatic circuit breaker 2 Sw...

Страница 28: ...e has been reset please inform your service technician green off red off yellow on Error 302 The device trips and reverts to grid input mode once the temperature has dropped Check the installation sit...

Страница 29: ...ight Check the PV cell voltage via the display in the N menu green flashes red off yellow off PV voltage too low PV generator voltage bet ween 100 V and 150 V Insufficient insolation Check the PV cell...

Страница 30: ...power GENERAL SPECIFICATION Model name SOLIVIA 2 5 EU G3 Max efficiency 96 0 Efficiency EU 94 4 Operating temperature 25 70 C Storage temperature 25 80 C Humidity 0 98 MECHANICAL DESIGN Size L x W x D...

Страница 31: ...thout isolated operation possibility single phase feed with anti islanding protection House connection box House connection line Low voltage network 400 230 V VNB Customer Owner boundary Z 1 Z 2 Measu...

Страница 32: ...box Selective main line circuit breaker House connection line Consumer equipment Automatic circuit breaker type B 16 A PV generator PV generator DC disconnector Solivia 2 5 Automatic circuit breaker t...

Страница 33: ...31 DC disconnector 1 2 3 PV generator L1 N PE L2 N PE L3 N PE Fuse L1 N n PE L2 L3 Solivia 2 5...

Страница 34: ...pro gram in which the storage space required for the execution e g variable code buffers for the program is reserved and is filled with initial values Local utility company By local utility company i...

Страница 35: ...Separate grid system Energy supply equipment which is completely independent of an interconnected grid Solar inverter is an electrical device which converts DC direct voltage into AC voltage and or di...

Страница 36: ...34 12 Certificates...

Страница 37: ...35...

Страница 38: ...ction device is an integral part of the aforementioned inverter This serves as a replacement for the disconnection device with insulating function which the distribution network provider can access at...

Страница 39: ...tstechnischen Anforderungen der aufgef hrten Pr fgrundlagen f r die bestimmungsgem e Verwendung Bericht Nummer 06KFS054 VDE0126 Zertifikat Nummer U10 135 Datum 2010 04 10 G ltig bis 2012 12 09 Andreas...

Страница 40: ...de rapport 06KFS054 VDE0126 Num ro de certificat U10 142 D livr le 2010 04 10 Valide jusque le 2012 12 09 Andreas Aufmuth Bureau Veritas Consumer Product Services GmbH Businesspark A96 86842 T rkheim...

Страница 41: ...o 2010 04 10 V lido at 2011 10 07 Andreas Aufmuth Bureau Veritas Consumer Product Services GmbH Businesspark A96 86842 T rkheim Duitsland 49 0 8245 96810 0 cps tuerkheim de bureauveritas com Potvrzen...

Страница 42: ...afwijkende grenswaarden voor Belgi op basis van EN 50438 2007 Annex A voor fotovolta sche installaties met een enkelfasige parallelvoeding door middel van gelijkstroom wisselstroommutator in het net v...

Страница 43: ...de coupure automatique fait partie int grante de ce convertisseur Il remplace l appareil de d connexion avec une fonction isolante auquel le fournisseur du r seau de distribution peut acc der tout mom...

Страница 44: ...gen Germany Sales Email sales solar inverter com Support Email support solar inverter com Sales Hotline 0180 10 SOLAR 76527 Support Hotline 0180 16 SOLAR 76527 Mondays to Fridays from 8 am to 5 pm apa...

Отзывы: