6.3 Low Voltage Ride Through (LVRT)
According to CEI 0-21, 8.5.1
To avoid undue separation from the network if voltage dips occur, a generation system
with over 6 kW total power must be able to comply with certain functional requirements,
which are known as LVRT(Low Voltage Ride Through) in international literature.
100%
0
time(ms)
U
grid /
U
n
2
1
90 %
40 %
3
200
400
0%
85 %
110%
Figure 6-4
:
LVRT characteristic
33
Active/Reactive Power Control and LVRT (Optional)
Содержание RPI-H3
Страница 2: ......
Страница 12: ...Figure 2 3 The identification label for H5 RPI H5 12 Installation and Wiring...
Страница 15: ...Figure 3 4 LCD display and buttons 3 2 1 LCD Display and Buttons 15 Product Overview...
Страница 18: ...Figure 4 1 Screw the mounting bracket for RPI H3 18 Installation...
Страница 19: ...Figure 4 2 Screw the mounting bracket for RPI H5 19 Installation...
Страница 20: ...Figure 4 3 Correct and incorrect installation illustration 4 3 a 90 C 4 3 b 4 3 c 20 Installation...
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...Version 04180115 5013208606...