Figure 4-10 : Inverter ID page
Figure 4-11 : Insulation page
Inverter ID is used in RS-485 communication, for PC recognizing the inverter.
If users connect several inverters together via RS-485, each inverter must have
different ID.
Before connecting to grid, inverter will measure the impedance between the PV
array and PE first. M88H models provide 2 types of impedance measurement
methods (ON and OFF) and 2 impedance limits.
Installer must select the appropriate method based on PV array’s wiring.
4.8.1 Inverter ID
4.8.2 Insulation
Setting ID
:
ID = 002
Inverter ID
:
2
Insulation
Grid Code
Grid Settings
►
EXIT
ENT
Mode
:
ON
Resistance
:
150kΩ
►
ON
OFF
►
EXIT
ENT
Figure 4-12 : Grid Code page
Each Grid Code has its own electricity regulations. Installer must select the Grid
Code correctly.
Inverter ID: 2
Insulation
Grid Code
Grid Settings
►
CUSTOM
►
4.8.3 Grid Code
EXIT
ENT
CHINA 2013 230/400V
FR-Is 50Hz 230/400V
FR-Is 60Hz 230/400V
FRANCE MV 230/400V
►
52
Commissioning
Содержание M88 Series
Страница 2: ......
Страница 29: ...Figure 3 16 AC gland assembling for M88H_122 Torque 0 8 N m to fix the screw 29 Installation ...
Страница 75: ...Figure 5 15 Removal of filters Figure 5 15 illustrates filters location of M88 series models 75 Maintenance ...
Страница 96: ......
Страница 97: ...M88H 操作手冊 三相併網型變流器 The power behind competitiveness www deltaww com English 1 97 繁體中文 ...
Страница 114: ...Necessary for vertical fixing Necessary for horizontal fixing 圖3 3 壁掛建議螺絲鎖附孔位置 至少8枚螺絲 圖3 4 錯誤的螺絲鎖附位置 114 安裝 ...
Страница 117: ...要使用遮蔽板 請參考圖3 9的安裝方式 鎖附扭力45 kgf cm 圖3 9 遮蔽板的安裝方法 117 安裝 ...
Страница 124: ...圖3 16 M88H_122交流固定頭的組裝方式 Torque 0 8 N m to fix the screw 安裝 124 ...
Страница 163: ...圖5 5 AC DC SPD 損壞時的告警 圖5 6 拔起連接線並移除螺絲 AC SPD DC SPD 163 維護 ...
Страница 169: ...圖5 14 拆卸功率模組風扇 僅以單側為例 組裝所需的螺釘扭矩 8 kgf cm 0 8N m 169 維護 ...
Страница 170: ...圖5 15 濾網拆卸方向 圖5 15為濾網位置 170 維護 ...
Страница 174: ...7 卸下8顆螺絲並用手抓住功率模組使其與配線箱分開 8 確定密封蓋有蓋上 圖5 18 拆下8顆螺絲後 將配線箱與功率模組分離 174 維護 ...
Страница 191: ......
Страница 192: ...Version 04201204 ...