10 De-Commissioning
De-Commissioning Procedure:
If necessary to put the device out of operation for maintenance and/or storage, please
follow the instructions below.
WARNING !
To avoid injuries, please follow this procedures
1. Switch off AC circuit breaker to disconnect from electricity grid.
2. Switch off the PV Array switch to disconnect from PV Array.
3. Use proper voltage meter to confirm that the AC and DC power are
disconnected from the unit.
4. Remove the AC wiring immediately to completely disconnect from electricity grid.
5. Remove the DC wiring to disconnect from PV Array.
6. After completing all of the above steps, the inverter can be removed.
47
De-Commissioning
Содержание H2.5 210
Страница 2: ......